Análisis geotécnico-económico comparativo entre diques construidos con materiales arcillosos y gravosos en el proyecto control de inundaciones del río Cañar

dc.contributor.advisorArmas Novoa, Rolando
dc.contributor.authorLligüi Ortega, Edgar Antonio
dc.contributor.authorÑauta Ñauta, Paul Eduardo
dc.contributor.tutorLeón Rodríguez, Jorge Víctor
dc.date.accessioned2014-02-10T11:54:49Z
dc.date.available2014-02-10T11:54:49Z
dc.date.issued2014
dc.descriptionLa presente tesis tiene como objetivo analizar desde el punto de vista geotécnico, las alternativas de diques planteadas en el proyecto Control de Inundaciones del río Cañar; mediante la construcción a escala real de 4 diques de prueba para determinar la opción más apropiada, a fin de implementarse en el proyecto. Se estableció una metodología de construcción apropiada y un control de calidad durante cada etapa del proceso constructivo para garantizar la funcionalidad, características estructurales y de resistencia de los diques una vez terminados. Mediante ensayos de laboratorio efectuados en los materiales arcillosos y granulares existentes en la zona, con los cuales se conformará los diques de prueba, se confirmó que cumplen con los parámetros necesarios para su posterior empleo en la construcción definitiva. Para evitar cualquier tipo de fallas catastróficas, se efectuaron análisis de permeabilidad y estabilidad en cada uno de los diques de prueba y se verificó que sí cumplen con los parámetros establecidos en el diseño del proyecto. Finalmente se pudo determinar que todas las alternativas de diques tienen un correcto comportamiento estructural y de resistencia, razón por lo cual es factible la utilización de cualquiera de las 4 alternativas planteadas; aunque desde el punto de vista económico, se establece que la soluciones más apropiadas son: el dique con pantalla de arcilla y espaldón granular, y el dique homogéneo de arcilla, el primero será construido en las márgenes de los ríos, y el segundo a lo largo del by-pass.es_ES
dc.description.abstractThe present study aims to analyze from a geotechnical perspective, alternatives to existing methods employed for flood control by the Cañar River project. By building four full-scale test embankments, the project was able to determine the most effective option to be implemented. Particular attention was given to construction methodology and quality control during each stage of the construction process to ensure the functionality, features and structural strength of the levees after completion. By laboratory tests carried out on subsurface conditions and materials in the area, it was confirmed that the required parameters for implementation in the final construction project were met. Furthermore, to avoid any catastrophic failures, each embankment was subjected to permeability and stability analysis. All four were found to comply with the appropriate design criteria. Finally, it was determined that each of the four alternatives were of optimum levee structural strength and implementable if so desired by the project; although from the economic perspective states that themost appropriate solutions are the clay dike screen and granular shoulder, and homogeneous clay dam, the first will be built on the banks of rivers, and the second along the bypass.es_ES
dc.description.cityCuenca, Ecuadores_ES
dc.description.degreeIngeniero Civiles_ES
dc.formatapplication/pdfes_ES
dc.identifier.urihttp://dspace.ucuenca.edu.ec/handle/123456789/5078
dc.language.isospaes_ES
dc.relation.ispartofseriesTI;945
dc.rightsopenAccess
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/
dc.subjectIngeniería Civiles_ES
dc.subjectEstructurases_ES
dc.subjectResistenciaes_ES
dc.subjectConstrucción de Diqueses_ES
dc.subjectFallas catastróficases_ES
dc.subjectEstabilidades_ES
dc.subjectPermeabilidades_ES
dc.subjectAnálisis económicoes_ES
dc.subjectInundacioneses_ES
dc.subjectRio Cañares_ES
dc.subjectProvincia del Cañares_ES
dc.subjectMaterial arcillosoes_ES
dc.titleAnálisis geotécnico-económico comparativo entre diques construidos con materiales arcillosos y gravosos en el proyecto control de inundaciones del río Cañares_ES
dc.typebachelorThesises_ES
dc.ucuenca.id0150697522es_ES
dc.ucuenca.paginacion97 páginases_ES

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Trabajo-de-Titulación.pdf
Size:
3.31 MB
Format:
Adobe Portable Document Format
Description:
Versión preesentada (texto completo)

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: