dc.contributor.advisorSempértegui Alvarez, Rodrigo Efraín-
dc.contributor.authorMosquera Avila, Giovanny Alejandro-
dc.date.accessioned2016-01-05T13:00:54Z-
dc.date.available2016-01-05T13:00:54Z-
dc.date.issued2015-
dc.identifier.urihttp://dspace.ucuenca.edu.ec/handle/123456789/23303-
dc.descriptionLos modelos de gestión utilizados enlas empresas de distribución de energía eléctrica tienen poco o ningún margen para analizar y evaluar las necesidades y prioridades reales de sus activos y conocer de alguna manera si los recursos invertidos en el programa de mantenimiento dan el máximo beneficio al sistema eléctrico. Los métodos o reglas empíricas utilizadas generalmente por las empresas de servicios públicos dan como resultado la asignación de presupuestos fijos, los cuales son establecidos para un período determinado de tiempo, lo cual ha llevado al uso ineficiente de los recursos disponibles, que a su vez se ven reflejados en menores niveles de fiabilidad para el cliente. La pregunta entonces es dónde y cuándo invertir para lograr el máximo beneficio y la forma de cuantificar los beneficios del mantenimiento. Este trabajo tiene como objetivo, en base de la bibliografía existente, desarrollar una metodología que permita la optimización de los programas de mantenimiento considerando el riesgo de ocurrencia de fallas en los equipos del sistema de distribución de energía eléctrica, a través de la evaluación del estado del equipo antes y después de la tarea de mantenimiento, y maximizar la reducción del riesgo alcanzado de esas tareas. Las tareas son priorizadas sujetas a las restricciones de los recursos disponibles utilizando técnicas de optimización adecuadas; con lo que se busca satisfacer los requisitos de confiabilidad a un costo mínimo tal como es la exigencia actual en las empresas modernas. El sistema eléctrico de distribución está conformado por una gran cantidad de elementos y equipos que pueden ser objeto de análisis en la metodología propuesta, pero de acuerdo al alcance del mismo se analizarán únicamente tres elementos importantes en este ámbito los cuales son: postes de madera, reconectadores y desbroce de vegetación. Debido a que los índices utilizados para calcular la reducción de riesgos están asociados con los efectos de las fallas permanentes, las fallas transitorias están excluidas de este análisis. Este trabajo busca presentar una estrategia que implique un avance en el estado actual de la técnica de mantenimiento del sistema de distribución, que asigna los recursos de mantenimiento a los diferentes equipos en función de su probabilidad y consecuencias de fallas. Con esta investigación se pretende encontrar herramientas,de apoyo a la toma de decisiones, para que el administrador de bienes o jefe de mantenimiento pueda tomar medidas en base a soluciones óptimas de programas de mantenimiento que le permitan una distribución de los recursos necesarios de forma coordinada.es_ES
dc.description.abstractManagement models used in the distribution companies of electricity have little or no room to analyze and evaluate the real needs and priorities of its assets and somehow know if the resources invested in the maintenance program give maximum benefit to the system electric. The methods or rules of thumb generally used by utilities result in the allocation of fixed budgets, which are established for a certain period of time, which has led to inefficient use of available resources, which in turn reflected in lower levels of reliability for the customer. The question is where and when to invest for maximum benefit and how to quantify the benefits of maintenance. This paper aims, on the basis of existing literature, developing a methodology for optimizing maintenance programs considering the risk of occurrence of equipment failure in the distribution system of electricity through the state assessment the equipment before and after the maintenance work and maximize risk reduction achieved these tasks. The priority tasks are subject to the restrictions of available resources using appropriate optimization techniques; thus it seeks to satisfy the reliability requirements at minimal cost as is the current requirement in modern business. The electricity distribution system consists of a lot of items and equipment that can be analyzed in the proposed methodology, but according to the scope of it will be analyzed only three important elements in this area which are wooden posts, reclosers and clearing of vegetation. Because the indices used to calculate the reduction of risks are associated with the effects of permanent faults, transient failures are excluded from this analysis. This paper aims to present a strategy that implies progress in the current state of the art distribution system maintenance, which assigns maintenance resources to the different teams according to their probability and consequences of failure. This research aims to find tools to support decision making, so that the asset manager or maintenance manager can take action based on optimal solutions of maintenance programs that allow a distribution of the resources in a coordinated way.es_ES
dc.formatapplication/pdfes_ES
dc.language.isospaes_ES
dc.relation.ispartofseriesTM4;972-
dc.subjectGestion De Activoses_ES
dc.subjectMantenimientoes_ES
dc.subjectRiesgoes_ES
dc.subjectRedes De Distribucion Electricaes_ES
dc.subjectEquiposes_ES
dc.subjectTesis De Maestria En Sistemas Electricos De Potenciaes_ES
dc.titleOptimización de proyectos de mantenimiento de redes de distribución eléctrica basado en el riesgo de la ocurrencia de fallas de sus equiposes_ES
dc.typemasterThesises_ES
dc.ucuenca.paginacion237 páginases_ES
dc.description.degreeMagíster en Sistemas Eléctricos de Potenciaes_ES
dc.description.cityCuencaes_ES
dc.ucuenca.id0101868552es_ES
dc.ucuenca.idautor0102137072es_ES
Appears in Collections:Tesis Maestrías

Files in This Item:
File Description SizeFormat 
Tesis.pdftexto completo5 MBAdobe PDFThumbnail
View/Open


This item is protected by original copyright



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Centro de Documentacion Regional "Juan Bautista Vázquez"

Biblioteca Campus Central Biblioteca Campus Salud Biblioteca Campus Yanuncay
Av. 12 de Abril y Calle Agustín Cueva, Telf: 4051000 Ext. 1311, 1312, 1313, 1314. Horario de atención: Lunes-Viernes: 07H00-21H00. Sábados: 08H00-12H00 Av. El Paraíso 3-52, detrás del Hospital Regional "Vicente Corral Moscoso", Telf: 4051000 Ext. 3144. Horario de atención: Lunes-Viernes: 07H00-19H00 Av. 12 de Octubre y Diego de Tapia, antiguo Colegio Orientalista, Telf: 4051000 Ext. 3535 2810706 Ext. 116. Horario de atención: Lunes-Viernes: 07H30-19H00