Revista Galileo
Permanent URI for this communityhttps://dspace-test.ucuenca.edu.ec/handle/123456789/26786
Browse
Browsing Revista Galileo by Subject "Canton Cuenca"
Now showing 1 - 2 of 2
- Results Per Page
- Sort Options
Item Sistema de tratamiento de aguas residuales de Ucubamba(Universidad de Cuenca, 2013-06) Ganzhi Fajardo, Fabián Patricio; Muñoz Gárate, Cristian; Rodríguez Pacheco, DanielThe wastewater treatment plant in Cuenca is located in the northeast of the city, in the area called Ucubamba. The main objectives aimed by the treatment plant can be summarized in the following ones: intercepting and conducting the water which formerly flowed to the rivers that run through the city and returning clean water to the environment. The ETAPA wastewater treatment plant is constituted by a preliminary treatment structure consisting of: settling tank, bypass, floodgates, mechanical screens, and grit chambers. After preliminary treatment of wastewater, the biological treatment stage starts, and it consists of three phases: aerated lagoons, facultative lagoons, and maturation lagoons. After the water is in suitable condition, it is moved by an unblock system which takes treated wastewater to the Cuenca River; this water can be safely reused in agriculture, hydropower, recreation, etc.Item Sistemas de agua potable y aguas residuales de la ciudad de Cuenca(Universidad de Cuenca, 2013-06) Avila, RosaThis paper deals with the purification system that has the city of Cuenca and its surroundings, processes that have been described and shown the reliability and quality that are made. There is also an explanation of their treatment of wastewater from the city of Cuenca, a brief description of the various devices and machines that handle the process.
