Repository logo
Communities & Collections
All of DSpace
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Pedroza Astudillo, Giovanny Rolando"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • Loading...
    Thumbnail Image
    Item
    Diseño de esquemas de auto-reconexión para la restauración del sistema de distribución de la Empresa Eléctrica Regional Centro Sur C.A.
    (2014) Balarezo Cobos, Jorge Luis; Pedroza Astudillo, Giovanny Rolando; Ugalde Delgado, Juan Hernando
    The mean purpose of this thesis work is to implement a holistic methodology oriented to improve the electric network reliability in CENTROSUR, the city of Cuenca-Ecuador local electricity provider. To meet this goal we propose the design of a methodology based on self-healing schemes for restoration of service, known by the electric industry as FLISR (Fault Location, Insulator and Service Restoration) through a Predictive Reliability Model (PRM) using historical outage data, distribution feeder models and customer and feeder load data. The study area considers five real distribution feeders, representing around the 15% of the total distribution system. We start from the definition of a customized calibration system model, constantly trying that PRM reflects the historical reliability, as a relevant purpose, using a five year historical outage data and reliability indices (TTIK, FMIK, SAIDI and SAIFI). It´s also important to mention that failure rates and mean times to repair (MTTR) were assigned to the distribution equipment (fuses, breakers, reclosers, etc.). As a next step, we identify a set of reliability improvement projects that need to be implemented, summarize as a new planning criteria, fuse-clearing and fuse-saving overcurrent protection schemes and distribution automation schemes. According to SAIDI final results, we prioritized the execution of the mention projects. Finally, using these final results we have done a cost-benefit analysis, recommending to CENTROSUR a project portfolio to accomplish, in order to better its network reliability metrics, showing the advantages, versatility and potential of the proposed PRM.

DSpace software copyright © 2002-2025 LYRASIS

  • Privacy policy
  • End User Agreement
  • Send Feedback