2024-03-29T15:41:42Zhttp://dspace.ucuenca.edu.ec/oai/requestoai:dspace.ucuenca.edu.ec:123456789/66782020-08-03T17:10:16Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Demanda eléctrica en instalaciones residenciales y comerciales
Avila G., Edgar
Picón B., Efraín M.
Jaramillo Paredes, Fabián
Canton Cuenca
Instalaciones Electricas
Se realiza un estudio para determinar la demanda eléctrica para las instalaciones interiores de locales residenciales y comerciales, localizados dentro de la ciudad de Cuenca. Se realiza una clasificación de abonados comerciales y residenciales, y se obtiene factores de demanda máxima para cada clase, La clasificación se realiza en función de la superficie de construcción o actividad comercial
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:57Z
2014-06-24T21:17:57Z
1988
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6678
spa
TE-64
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/313292020-08-03T17:12:49Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Coordinación de protecciones de la Refinería Shushufindi considerando el ingreso de un nuevo turbogenerador de 5 MW
Simbaña Pulupa, Geovanny Enrique
Apolo Armijos, Ronald Vicente
Sanango Fernández, Juan Bautista
Zeas García, Serafín Euclides
Ingenieria Electrica
Protecciones Electricas
Flujos De Potencia
Cortocircuito
El Complejo Industrial Shushufindi (CIS), con el objeto de mejorar la confiabilidad, continuidad y autosuficiencia del suministro de energía eléctrica para los procesos de refinación y para no tener dependencia de la red externa; tiene previsto la adquisición de una nueva unidad de generación cuya capacidad es de 6.3 MW nominal, que será impulsada mecánicamente mediante una turbina a gas residual como energía primaria, que por razones de eficiencia y rendimiento de la turbina se tendrá como resultado la generación de una potencia máxima efectiva de 5 MW.
El ingreso de esta unidad de generación provoca un cambio en la topología de la red actual, de manera que los ajustes de protección de cada elemento dentro del sistema se tienen que reajustar.
En este sentido, el presente proyecto parte del levantamiento en campo de características de los elementos que componen la red actual, además la obtención de información específica de los equipos que serán parte del nuevo sistema.
Para el modelamiento de la red se optó por la utilización de una herramienta computacional; donde mediante simulaciones ante diferentes condiciones del sistema a demanda máxima y estado estacionario, se realizó el estudio de flujos de potencia y cortocircuito por posibles fallas en barras principales a fin de establecer según los resultados obtenidos una efectiva coordinación de las protecciones considerando los criterios de selectividad y rapidez recomendados por las normas vigentes.
Por último, se determinan las características técnicas mínimas de equipos de protección adicionales de la nueva unidad de generación.
The Shushufindi Industrial Complex (CIS), with the purpose of improving the reliability, continuity and self-sufficiency of the electric power supply for the refining processes and not having dependence on the external network; plans to acquire a new generation unit with a rated capacity of 6.3 MW, which will be driven mechanically by means of a residual gas turbine as primary energy, which, for reasons of turbine efficiency and performance, will result in the generation of an effective maximum power of 5 MW.
The input of this generation unit causes a change in the topology of the current network, so that the protection settings of each element within the system have to be readjusted.
In this sense, the present project starts from the field survey of characteristics of the elements that make up the current network, as well as obtaining specific information about the equipment that will be part of the new system.
For the modeling of the network, the use of a computational tool was chosen; where by simulations to different conditions of the system at maximum demand and steady state, the study of power flows and short circuits for possible faults in main bars was carried out in order to establish, according to the results obtained, an effective coordination of the protections considering the selectivity criteria and speed recommended by the regulations in force.
Finally, the minimum technical characteristics of additional protection equipment of the new generation unit are determined.
Ingeniero Eléctrico
Cuenca
2018-10-04T15:41:20Z
2018-10-04T15:41:20Z
2018
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/31329
spa
TE;436
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/6692020-08-03T17:08:22Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Adquisición de datos de las variables de los procesos de la planta de fuerza del molino papelero CARTOPEL
Guamán Sánchez, Cristian Fernando
Bravo Padilla, Eddy Gabriel
Larco Barros, Ciro Mauricio
Ingenieria Electrica
Planta De Fuerza
Energia Electrica
Sistema Scada
El presente proyecto de tesis tiene como objetivo proponer el diseño de un sistema de supervisión, control y adquisición de datos (SCADA); en base a la tecnología actual, para monitorear en tiempo real y en forma individual cada uno de los procesos de la Planta de Fuerza del Molino Papelero Cartopel. La Planta de Fuerza hasta la actualidad está conformada por cinco procesos que son indispensables para el proceso de fabricación del papel y son: Distribución de la Energía Eléctrica, Generación de Vapor, Producción de Agua Tratada, Producción de Aire Comprimido, Recuperación de Agua y Pasta. Para la realización del proyecto primero se realiza la descripción de cada uno de los procesos, para luego hacer un levantamiento técnico de los equipos existentes en planta de fuerza y determinar las variables a medir y controlar. Posteriormente se presentauna solución de hardware en donde se puede apreciar equipos tales como instrumentación de medición y control, transmisores, PLC s, switch; para luego dar a conocer un costo aproximado de la implementación del proyecto. Finalmente se muestra una solución de software realizada en el programa HMI SIMATIC WINCC flexible 2008, el cual nos permite crear y editar proyectos de supervisión y control en el ámbito de las instalaciones industriales por medio de paneles de operador en base a los requerimientos de la empresa.
Ingeniero Eléctrico
Cuenca
2013-06-05T14:24:56Z
2013-06-05T14:24:56Z
2011
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/669
spa
TE;309
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/335692020-08-03T17:10:49Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Estudio de pre-factibilidad para la integración de generación fotovoltaica en el alimentador S-0427 dentro del complejo hidroeléctrico Machángara por parte de la Empresa Electro Generadora del Austro ELECAUSTRO S.A.
Tituana Tituana, Cristian John
González Morales, Luis Gerardo
Sarmiento Vintimilla, Juan Carlos
Ingeniería Eléctrica
Fotovoltaico
Hidroeléctrica
Generación voltaica
La presente tesis muestra el análisis de pre-factibilidad elaborado en convenio con la Empresa Electro Generadora del Austro. Dicho análisis es aplicado al Complejo Hidroeléctrico Machángara donde se determinaron áreas con características suficientes para la integración de diseños fotovoltaicos mediante exploración. Además, Se realizan diseños a nivel de pre-factibilidad correspondiente a cada área para su evaluación técnica y económica.
A partir del establecimiento de áreas útiles para la generación fotovoltaica y diferentes alternativas de diseño técnico a nivel de pre-factibilidad, se procede a realizar el análisis técnico y análisis económico bajo diferentes escenarios de financiamiento. Como resultados se obtiene el presupuesto aproximado necesario, el costo medio de producción de energía y la existencia de pre-factibilidad para el sector delimitado.
Finalmente, se determinó la existencia de pre-factibilidad técnica y económica para la integración de generación fotovoltaica para los sectores de Saucay, Dutasay y Labrado. Resultado obtenido al determinar el escenario de financiamiento y diseño técnico que ofrece mayor relación costo-beneficio correspondiente a cada área.
This thesis shows the pre-feasibility analysis prepared in covenant with the Company Empresa Electro Generadora del Austro. This analysis is applied to the Complejo Hidroeléctrico Machángara where areas with sufficient properties for the integration of photovoltaic designs were determined through exploration. In addition, pre-feasibility level designs corresponding to each area are made for technical and economic evaluation.
From the establishment of useful areas for photovoltaic generation and different alternatives of technical design at the prefeasibility level, the technical analysis and economic analysis are carried out under different financing scenarios. As a result, the necessary approximate budget, the average cost of energy production and the existence of pre-feasibility for the delimited sector are obtained.
Finally, the existence of technical and economic pre-feasibility for the integration of photovoltaic generation for the Saucay, Dutasay and Labrado sectors was determined. Result obtained by determining the financing and technical design scenario that offers the highest cost-benefit ratio corresponding to each area.
Ingeniero Eléctrico
Cuenca
2019-10-25T16:51:48Z
2019-10-25T16:51:48Z
2019-10-25
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/33569
spa
TE;465
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/313032020-08-03T17:12:41Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Manual de verificación y mantenimiento subestación eléctrica CC Santo Domingo
Jaramillo Carrión, Luis Ramiro
Miño Santander, Luis Bolívar
Sempértegui Alvarez, Rodrigo Efraín
Ingenieria Electrica
Mantenimiento Preventivo
Manual De Procedimientos
Maquinas Electricas
Subestacion Electrica
Provincia De Santo Domingo De Los Tsachilas
En este trabajo se ha elaborado una guía para la realización de los trabajos de mantenimiento tanto preventivo como correctivo en la Subestación Eléctrica del Centro Comercial Paseo Shopping de Santo Domingo. (Subestación Eléctrica del CCPS).
Tomando en consideración, parámetros y normas internacionales que permitan precautelar la seguridad tanto del personal actual como el que vendrá contratado por las empresas que proveerán este servicio; de igual manera se enfatiza en la asignación de tareas y registro de actividades con la finalidad que no se deje de atender ningún aspecto del mantenimiento tanto preventivo como correctivo y que permita mantener un estatus de confiabilidad y rendimiento óptimo de los equipos y máquinas eléctricas que componen esta estación.
Para comenzar este trabajo es necesario obtener un conocimiento previo de los elementos que conforman la subestación eléctrica, su composición, estructura y funcionamiento, a continuación se dan a conocer los principios del mantenimiento y sus facetas principales, luego en base a esta información se han elaborado los métodos y procedimientos a seguir para la ejecución de los distintos mantenimientos, como el mantenimiento preventivo; el mantenimiento correctivo, entendido este último como una actividad no planificada y de resolución inmediata. Finalmente se ha concluido con la gestión documental de estas tareas y procedimientos, de tal manera que se facilite registrar y cuantificar estas actividades, lo cual será de mucha utilidad para mantener una base de datos histórica que proporcione información que permita prevenir daños futuros, mejorar y/o rediseñar estos procesos y de esta manera ahorrar recursos e incrementar la confiabilidad de los equipos eléctricos de la sub estación.
This document is a guide for the performance of both preventive and corrective maintenance work in the Electric Substation of the Paseo Shopping Mall in Santo Domingo.
We take into this document, international parameters and norms that allow to safeguard the safety of the personnel that currently works, and the others that will be assigned by the companies to provide this service; in the future.
Also, it is emphasized in assignment of tasks and the recording of activities in such a way to register and quantify these activities, which will be very useful to maintain a historical database to prevent future damage, improve and / or redesign these processes and thus save resources and increase the reliability of electrical equipment of the substation.
.
To begin this work it is necessary to obtain a prior knowledge of the elements that make up the electric substation, its composition, structure, operation, then highlighted the importance of maintenance and its main facets, then based on these previous chapters has been designed and elaborated the methods and procedures to be followed for the preventive maintenance, and later the corrective maintenance, understood the latter as an unplanned activity and to resolution immediate , and finally it has been concluded with the documentary management of these tasks and procedures, of such way to register and quantify these activities, which will be very useful to maintain a historical database to prevent future damage, improve and / or redesign these processes and thus save resources and increase the reliability of electrical equipment of the substation.
ingeniero Eléctrico
Cuenca
2018-10-02T14:51:54Z
2018-10-02T14:51:54Z
2018
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/31303
spa
TE;430
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65902020-08-03T17:09:44Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Diseño de una red GSM para los cantones de: Cuenca, Paute, Gualaceo, Chordeleg, Girón y Santa Isabel
Pinos Espinoza, Hugo Alejandro
Urdiales Flores, Luis Eduardo
Andrade Rodas, Juan
Telecomunicaciones
Hardware
Canton Cuenca
Ingenieria Electrica
Esta tesis fue elaborada con la finalidad de analizar la factibilidad de implementar un sistema de Segunda Generación Celular, se escogieron los principales cantones del Azuay, se realizaron encuestas en diferentes instituciones con la finalidad de tener un claro conocimiento de la aceptación que tendrá este nuevo sistema. Las diferentes coberturas fueron colocadas y calculadas, utilizando las recomendaciones dadas por el método de Okumura-Hata.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:48Z
2014-06-24T21:17:48Z
2002
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6590
spa
TE-249
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66052020-08-03T17:07:13Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Ubicación óptima de la nueva subestación alta tensión media tensión en la zona urbana de Cuenca
Machado Solís, Jorge Santiago
Albornoz Vintimilla, Claudio Esteban
Alta Tension
Media Tension
Electricidad
Empresa Electrica
Este trabajo basa su enfoque en la ubicación óptima de subestaciones de distribución alta tensión - media tensión, aplicada al caso particular de la nueva subestación en la zona urbana de Cuenca. Dicho trabajo se desarrolla en un principio con un análisis del sistema actual de la Empresa Regional Centrosur C.A. para luego aplicar la metodología de Momentos de flujo de potencia obtener cinco casos de ubicación de la nueva subestación eligiendo el que presente menores costos y mayor confiabilidad. Por último se realiza la reconfiguración de los alimentadores que transfirieron carga a la nueva subestación así como de los nuevos alimentadores.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:49Z
2014-06-24T21:17:49Z
2006
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6605
spa
TE-263
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66562020-08-03T17:10:14Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Estudio de las protecciones del anillo de 69 Kv. del Sistema Regional Centro Sur
Ortiz Larrea, Juvenal
Mora Espinoza, Santiago
Carrillo Torres, Hernán
Empresa Electrica
Protecciones Electricas
Ingenieria Electrica
Se determina el esquema de protección más adecuado para el sistema de subtrasmición a 69 kv. de la E.E.R.C.S.; así como su debida coordinación, uno de los resultados obtenidos es el que no se debería tener subanillos ya que se vuelve el proceso de coordinación. La protección de los alimentadores radiales debería realizarce con reles de sobrecorriente.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:54Z
2014-06-24T21:17:54Z
1985
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6656
spa
TE-42
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/312762020-08-03T17:12:43Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Auditoria energética y propuesta de actualización tecnológica a las plantas de trituración de piedra y planta de asfalto, propiedad de la constructora THOT ubicada en el cantón Catamayo – provincia de Loja
Enríquez López, Jorge Luis
Bermeo Iñiguez, Byron Alcívar
Sanango Fernández, Juan Bautista
Auditoria Energetica
Analisis De La Calidad De Energia
Aislamiento Electrico De Motores
Grupos Electrogenos
En base a la premisa de un crecimiento sostenible que permita una convivencia armónica entre la sociedad y el medio ambiente, se plantea una auditoria energética y propuesta de actualización tecnológica a las plantas de trituración de piedra y planta de asfalto de la constructora THOT Cía. Ltda. ubicada en el cantón Catamayo de la provincia de Loja.
Los equipos eléctricos tanto de maniobra, protección y las máquinas eléctricas que contribuyen a la operación de las plantas de trituración y planta asfalto son antiguos, por lo que es oportuno evaluar la eficiencia de los sistemas eléctricos instalados.
Las fuerzas motrices para los equipos se impulsan por motores eléctricos alimentados por grupos electrógenos turbo diésel.
El proceso de auditoria energética incluye la recopilación de información, análisis de datos y la toma de decisiones. Esta será la información inicial para determinar la metodología técnica en la consultoría energética a aplicar y posterior propuesta de actualización tecnológica que permita optimizar los procesos de producción y la coordinación de las protecciones eléctricas bajo principios técnicos y de seguridad laboral.
Based on the premise of sustainable growth that allows a harmonious coexistence between society and the environment, an energy audit and proposal of technological update to the asphalt stone and silver crushing plants is proposed, of the construction company THOT Cia Ltda. located in the canton Catamayo province of Loja.
The electrical equipment for maneuver, protection and electrical machines that contribute to the operation of the crushing plants and asphalt plant are old, so it is appropriate to evaluate the efficiency of the installed electrical systems.
The driving forces for the equipment are driven by electric motors powered by turbo diesel generator sets.
The energy audit process includes the collection of information, data analysis and decision making. This will be the initial information to determine the technical methodology in the energy consultancy to be applied and the subsequent technological update proposal that allows optimizing the production processes and the coordination of electrical protections under technical principles and job security.
Ingeniero Eléctrico
Cuenca
2018-09-28T16:57:11Z
2018-09-28T16:57:11Z
2018
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/31276
eng
TE;427
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64492020-08-03T17:07:34Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Evaluación y operación de luminarias para alumbrado público
Díaz Guillén, Miguel
Peña Cisneros, Petronio
Sempértegui Alvarez, Rodrigo Efraín
Alumbrado Electrico
Alumbrado Publico
Los objetivos de esta tesis son establecer un precedente de normalización, determinar los lineamientos para la implementación de laboratorios de pruebas que permitan verificar y certificar el desempeño de las luminarias y divulgar los tópicos relacionados con una adecuada operación y mantenimiento de las luminarias, limitando su alcance a luminarias empleadas para el alumbrado vial
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:28Z
2014-06-24T21:17:28Z
1992
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6449
spa
TE-121
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/209222020-08-03T17:08:11Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Sistema automatizado de mantenimiento centrado en confiabilidad (MCC) para proyectos de electrificación rural con sistemas individuales fotovoltaicos en la amazonía ecuatoriana
Orellana Maldonado, Edwin Stalin
Porras Reyes, Jerfferson Alberto
Espinoza Abad, Juan Leonardo
Electrificacion
Energia Fotovoltaica
Energia Electrica
Ingenieria Electrica
Empresa Electrica
El presente trabajo de investigación tiene como objetivo principal desarrollar un sistema automatizado de Mantenimiento Centrado en Confiabilidad (MCC) que permita a la Empresa Eléctrica Regional CENTROSUR C.A. monitorear la confiabilidad operacional de su Proyecto “Yantsa li Etsari” (“Luz de nuestro sol”), aportando a la sostenibilidad del mismo. El proyecto se desarrolla en las comunidades de la región amazónica que no tienen acceso a la red eléctrica, dentro del área de concesión de la Centrosur (provincia de Morona Santiago).
Para lograr dicho objetivo se plantea una metodología de MCC para los sistemas fotovoltaicos autónomos que forman parte del proyecto, utilizando la técnica Análisis Modal de Falla y Efecto (AMFE), la cual se basa en el cálculo del Índice de Prioridad de Riesgo (IPR) con el fin de priorizar la causa potencial del fallo para posibles acciones correctoras.
La recolección de información consistió en dos fases, en la primera fase se recopilaron datos históricos de fallas en equipos de los sistemas fotovoltaicos autónomos del proyecto YantsaIiEtsari, información disponible en la base de datos de Centrosur C.A. En la segunda fase, los autores efectuaron visitas de campo en veinticinco comunidades amazónicas beneficiarias del proyecto para recolectar información por medio de encuestas y así mismo verificar visualmente el estado de los sistemas fotovoltaicos.
Con la información levantada se realizó un análisis para jerarquizar los equipos críticos utilizando la técnica Análisis de Criticidad (AC), y una vez jerarquizados, se identificaron las posibles causas que originan los fallos mediante la técnica Análisis Causa Raíz (ACR).
Finalmente se implantó la metodología MCC propuesta en el software Microsoft Access, indicando los pasos a seguir para la utilización óptima de este sistema automatizado y demostrando, a través de un ejemplo, su eficacia en lo que respecta al mantenimiento de los sistemas fotovoltaicos autónomos del proyecto YantsaIiEtsari.
The main objective of this research is to develop an automated system of Reliability Centered Maintenance (RCM) to enable the Regional Electricity Company CENTROSUR CA monitoring the operational reliability of the project "YantsaIi Etsari" (“Light from our sun”), contributing to its sustainability. The project is developed in the isolated communities located in the Amazon region, within the concession area of Centrosur (province of Morona Santiago).
To achieve this objective an RCM methodology is proposed for the stand-alone photovoltaic (PV) systems that are part of the project, using the technique Failure Mode and Effects Analysis (FMEA), which is based on calculating Risk Priority Index (RPI) in order to prioritize the potential cause of failure for possible corrective actions.
Data collection was approached in two phases.The first phase consisted of collecting historical failure data in equipment of stand-alone photovoltaic systems of the Yantsa Ii Etsari project, information available in the Centrosur CA database. In the second phase, the authors conducted field visits to twenty five Amazonian communities benefiting from the project in order to collect data through surveys as well as visually checking the status of PV systems.
With the raised information, an analysis was performed to prioritize critical equipment using the technique Criticality Analysis (CA), and once the equipmentwas hierarchized, possible causes of the failures were identified through the technique Root Cause Analysis (RCA).
Finally theRCM methodologywas implemented in Microsoft Access software, indicating the steps to follow for optimal use of this automated system and demonstrating, through an example,how effective might be RCMin regard to maintenance of stand-alone photovoltaic systems of the Yantsa Ii Etsari project.
Ingeniero Eléctrico
Cuenca
2014-11-28T11:58:30Z
2014-11-28T11:58:30Z
2014
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/20922
spa
TE;375
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66752020-08-03T17:10:35Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Selección óptima de unidades térmicas de generación utilizando programación entero-mixta
Alvarez A., Willam
Arizaga P., Galo
Durán Noritz, Carlos
Unidades Termicas
Programacion Entero Mixta
El objetivo de la tesis es la selección óptima de unidades de generación térmica, utilizando técnicas de programación mixta, se utilizan en el Sistema Eléctrico Regional Centro Sur una de las técnicas de programación lineal llamada programación simplex de costos desfavorables. Por lo que se realiza un programa en FORTRAN IV, y un manual para el uso del programa digital
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:57Z
2014-06-24T21:17:57Z
1987
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6675
spa
TE-61
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64342020-08-03T17:07:26Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis de la confiabilidad de servicio en sistemas de distribución
Arévalo P., Hugo
Neira C., Diego
León Córdova, Pedro
Energia Electrica
Ingenieria Electrica
La presente tesis está dirigida a buscar los mecanismos para la recepción y validación de información relacionada con suspensiones de servicio que se presentan en la EERCS; procesar esta información mediante el programa computacional SICEF [Sistema de información computarizada para estadística de fallas] y mediante el mismo dar las alternativas para minimizar las fallas del sistema mediante programas de mantenimiento adecuados. Los temas que enfoca la tesis son: Interrupciones de servicio, fallas de componentes y atención de reclamos de los clientes, estudio económico de pérdidas por suspensiones de servicio. SICEF: Manual técnico y manual del usuario. Resultados estadísticos
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:26Z
2014-06-24T21:17:26Z
1991
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6434
spa
TE-107
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/285852020-08-03T17:08:36Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Planeamiento de la expansión de sistemas de transmisión usando el modelo AC y algoritmos de estimación de distribución
Morquecho Salto, Edgar Gonzalo
Torres Contreras, Santiago Patricio
Sistema De Transmision
Algoritmos De Estimacion
Optimizacion
El problema del planeamiento de la expansión del sistema de transmisión (PET) consiste en determinar la red de transmisión a construir para satisfacer los requerimientos de la demanda futura para un escenario de largo plazo, minimizando el costo de inversión y cumpliendo las restricciones de la red. Esta tesis presenta una metodología y un modelo matemático para resolver el problema del planeamiento de la expansión del sistema de transmisión estático de largo plazo. El modelo matemático utilizado para representar a la red es el modelo AC con ecuaciones de flujo de carga no lineales, este modelo representa un problema de programación no lineal, entero mixto (PNLEM), combinatorial y no convexo. La función objetivo a minimizar permite incluir tanto el costo por inversión como el costo asociado por pérdidas de potencia activa. Los algoritmos de estimación de distribuciones (EDAs) como técnica de optimización para resolver el PET. En este trabajo se utilizan los algoritmos son técnicas meta-heurísticas que basan su búsqueda en generar un modelo probabilístico de las soluciones prometedoras para generar la siguiente población. Los algoritmos propuestos se prueban sobre los sistemas de Garver de seis nodos y el sistema IEEE de veinte y cuatro nodos.
The Transmission Network Expansion Planning (TNEP) problem consists of determine the transmission network to be built to meet the future demand requirements for a long-term scenario, minimizing the cost of investment and meeting the technical criteria of the network. This research work thesis presents a methodology and a mathematical model to solve the long-term static Transmission Network Expansion Planning. The AC model with non-linear load flow equations is used to represent the transmission network, which represent a non-linear, mixed-integer problem (MINLP), combinatorial and non-convex problem to solve the TNEP. The objective function to be minimized allows to include both the cost per investment and the cost associated per active power losses. The Estimation of Distribution Algorithms (EDAs) are used as optimization technique to solve the TNEP. These algorithms are meta-heuristic techniques that base its search on generate a probabilistic model of the promising solutions to generate the next population. The proposed algorithms are tested on Garver 6-node systems and on the IEEE 24-node system.
Ingeniero Eléctrico
Cuenca
2017-11-27T15:43:48Z
2017-11-27T15:43:48Z
2017
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/28585
spa
TE;412
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/53122020-08-03T17:12:19Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Mejoramiento del sistema del alumbrado público de una arteria de circulación vehicular de la ciudad de Cuenca mediante la sustitución por tecnología LED (Light Emitting Diode)
Lojano León, Luis Miguel
Orellana Lonajo, Franklin René
Merchán Manzano, Hernando Efraín
Alumbrado Publico
Circulacion Vehicular
Arteria Vial
Energia Electrica
Contaminacion
Economia
Canton Cuenca
El alumbrado público es una parte importante del sector eléctrico, contribuyendo en la vida del ser humano, influyendo en su desarrollo y aportando a su seguridad.
El presente estudio pretende analizar técnica y económicamente una alternativa tecnológica como la que utiliza luminarias LED (LIGHT EMITTING DIODE), para el mejoramiento del sistema del alumbrado público, que no es nueva, pero debido a sus avances en los últimos años nos impulsan a realizar un análisis respectivo.
En el capítulo 2 se dará a conocer los conceptos básicos, fenómenos, y normas que rigen la iluminación específicamente en el alumbrado público.
En los capítulos 3 y 4 se hará una descripción del tipo de luminarias más usadas actualmente para el alumbrado público así como un análisis de la tecnología LED con sus respectivas ventajas y desventajas entre las lámparas.
En los capítulos 5 y 6 se dará a conocer la situación actual del sistema del alumbrado público de la ciudad de Cuenca, así como la de la arteria vial elegida para su respectivo análisis técnico y económico, que compara una instalación totalmente nueva de lámparas de sodio a alta presión en contra de una instalación de lámparas LED`s.
Finalmente se presentan los resultados, conclusiones y recomendaciones para la elección de la tecnología más adecuada a ser utilizada en los sistemas de alumbrado público.
Public lighting is an important part of the electrical sector because of its contribution to people's daily lives and its influence on the development and security of our society.
The aim of the current research is to analyze techniques and technological alternatives such as the use of LED lights (LIGHT EMITTING DIODE) in order to improve the public lighting system, which is not so new, but due to recent progress, we must perform a corresponding analysis.
In chapter 2, we present some basic concepts, phenomena, and standards which control lighting, especially public lighting.
In chapters 3 and 4 we will give a description of the most commonly used kinds of lighting today. Also, we will analyze the LED technology and the respective advantages and disadvantages among different sorts of lamps.
In chapters 5 and 6, we will talk about the current situation of public lighting in our city. Likewise, we will compare the installation of high pressure sodium lamps to LED lamp installation on a previously chosen road or street.
Finally, results, conclusions and recommendations are presented in order to choose the most convenient technology to be used in public lighting systems.
Ingeniero Eléctrico
Cuenca
2014-03-20T14:05:35Z
2014-03-20T14:05:35Z
2014
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/5312
spa
TE;359
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66482020-08-03T17:10:08Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Interpretación gráfica y solución digital de mallas en corriente alterna
Jaramillo P., Juan Carlos
Balarezo R., Luis Fernando
Cordero Díaz, Eugenio
Energia Electrica
Corriente Alterna
El objetivo de la tesis es el de desarrollar y aplicar un modelo de solución para la interpretación gráfica del circuitos eléctricos. Se revisan conceptos de la teoría general de circuitos eléctricos; para en el capítulo III presentar un grupo de programas y sub rutinas, con sus listados correspondientes. En la sección 4.6 se presenta una guía práctica para el usuario con el fin de hacer más fácil la utilización de los programas mencionados.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:54Z
2014-06-24T21:17:54Z
1984
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6648
spa
TE-33
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64632020-08-03T17:08:49Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis de la conveniencia de la sustitución de equipos Ward-Leonard, para control de motores de corriente continua por sistemas estáticos con el comando de PLC, aplicado a la tubería doble de la compañía Ecuatoriana del Caucho
Castro Guzmán, Cornelio
Ochoa Figueroa, Edgar Efraín
Viteri Cerda, Fabián
Chérrez Tamayo, Antonio
Energia Electrica
Control De Motores
Corriente Continua
Ingenieria Electrica
El objetivo de la tesis es proporcionar una recomendación a ERCO sobre la conveniencia de sustituir el equipo Ward-Leonard que controla la velocidad de los motores de corriente continua para las extruidoras de ocho un medio y diez de la tubera doble, por un sistema estático de control de velocidad comandado por controladores lógicos programables PLE. Las razones por las cuales se debe hacer la sustitución son: El sistema moto-generador Ward-Leonard es un sistema de control analógico que no ofrece un control tan fino y preciso como lo hace un sistema de control estático. El sistema Word-Leonard ocupa demasiado espacio útil y produce mucho ruido, además es más caro que el sistema estático comandado por PLC.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:30Z
2014-06-24T21:17:30Z
1993
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6463
spa
TE-134
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/435332024-01-04T18:56:55Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Control de la tensión en un punto de la red de distribución aplicando el concepto Vehicle to Grid (V2G) mediante la utilización de los equipos de almacenamiento energético disponible en el laboratorio de Micro-Red de la Universidad de Cuenca: Simulación y validación experimental
Quezada Ordóñez, Andrew Israel
Nivicela Quito, Alexander Gustavo
Ochoa Correa, Danny Vinicio
Ingeniería Eléctrica
Electromovilidad
Vehículos eléctricos
CIUC::Ingenierías::Ingeniería Eléctrica
Este artículo académico presenta, en primera instancia, un breve análisis de las
características de los vehículos eléctricos y de los equipos que se usan en el proceso de
carga de sus baterías. Además, se ofrece un panorama de la electromovilidad en Ecuador y
se examina las prestaciones de la tecnología V2G para el mejoramiento de la calidad de la
energía. El enfoque principal de esta investigación es el desarrollo de un método de control
de tensión en un punto de conexión de la red eléctrica de baja tensión, usando los
componentes de carga de un vehículo eléctrico. Mediante la simulación en la herramienta
Simulink de Matlab, se aplica la teoría necesaria para emular las ecuaciones y componentes
eléctricos involucrados, utilizando un controlador proporcional-integral como método de
control. Para la validación experimental, se utilizan recursos del laboratorio de Micro-Red de
la Universidad de Cuenca, emulando la red con la alimentación proveniente del alimentador
0523, la carga del VE con la unidad de carga programable, la estación de carga con un
inversor bidireccional y el sistema de almacenamiento del VE con una batería de litio. Como
método de control se implementó una rutina de MATLAB vinculada al sistema SCADA para
controlar la potencia reactiva entregada por el inversor, misma que es basada en un
controlador PI. Se concluye que el método propuesto mantiene efectivamente la tensión
dentro de los límites normativos y no descarga significativamente la batería, asegurando que
no hay impacto negativo en la longevidad del sistema de almacenamiento del VE.
This academic article begins with a brief analysis of the characteristics of electric vehicles and
the equipment used in the battery charging process. Furthermore, it provides an overview of
the state of electromobility in Ecuador and examines the performance of Vehicle-to-Grid (V2G)
technology for enhancing energy quality. The main focus of this research is to develop a
voltage control method at a low-voltage electrical network connection point using the charging
components of an electric vehicle. Simulink software simulation applies the necessary theory
to emulate the equations and electrical components involved, using a Proportional-Integral
controller as the control method. For experimental validation, resources from the University of
Cuenca's microgrid lab are used, emulating the network with power from feeder 0523, the
EV's load with programmable load, the charging station with a bidirectional inverter, and the
EV's storage system with a lithium battery. This approach is complemented by a MATLAB
routine linked to SCADA for the inverter's reactive power control based on a PI controller.
Graphic results for both simulation and experimental validation are presented. It concludes
that the proposed method effectively maintains voltage within regulatory limits without
significantly discharging the battery, ensuring no negative impact on the EV's storage system's
longevity.
0000-0001-5633-1480
2025-01-03
2024-01-04T18:56:51Z
2025-01-04
2024-01-04T18:56:51Z
2024-01-04
http://dspace.ucuenca.edu.ec/handle/123456789/43533
spa
TE;513
Attribution-NonCommercial-NoDerivatives 4.0 Internacional
http://creativecommons.org/licenses/by-nc-nd/4.0/
restrictedAccess
application/pdf
70 páginas
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/66212020-08-03T17:09:51Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Aplicación de la tecnología Bluetooth a los sistemas de medición de agua de consumo doméstico
Marín A., Daniel
Muso, Nelson P.
Cabrera Albornoz, Fabián
Software
Hardware
Energia Electrica
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:51Z
2014-06-24T21:17:51Z
2004
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6621
spa
TE-277
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/425892023-08-31T12:08:16Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Reducción de espacio de búsqueda usando algoritmos de aprendizaje no supervisado aplicado al problema de la expansión del sistema de transmisión de energía eléctrica
Minchala Naula, Wilson Patricio
Torres Contreras, Santiago Patricio
Ingeniería Eléctrica
Sistemas de transmisión
Suministro de energía
Sistema eléctrico
CIUC::Ingenierías::Tecnología Energética::Transmisión de Energía
La demanda de energía eléctrica actual requiere de adiciones de infraestructura en los
sistemas de transmisión que se vuelven más grandes cada vez. Una planificación de la
expansión del sistema de transmisión (TEP) se encarga de identificar las adiciones
necesarias en el sistema eléctrico. Sin embargo, ese proceso resulta difícil debido a la
cantidad de variables a tratar. Estas variables son el resultado del número líneas candidatas
que se consideran (espacio de búsqueda) en un modelo de optimización. En este trabajo se
presenta una estrategia de agrupación de líneas candidatas con el objetivo de reducir este
espacio de búsqueda. Esta estrategia combina herramientas del aprendizaje no supervisado
como el clustering y el análisis de la operación del Sistema de Suministro de Energía Eléctrica
(SSEE) llamados flujos óptimos de potencia. Esta combinación sirve para clasificar las líneas
candidatas bajo 3 criterios: sobrecarga, mínimo esfuerzo y costo-beneficio. Estos criterios se
aplican a cada sistema de estudio que se analiza: Garver 6 Barras, IEEE 24 Barras y IEEE
188 Barras, para determinar el más apropiado en cada caso. Esto con el fin de formar e
identificar grupos de líneas poco representativos para descartarlos, dando como resultado un
nuevo espacio de búsqueda reducido para los sistemas y conseguir una mejora significativa
en la eficiencia del proceso de Planificación de la Expansión de Sistemas de Transmisión.
The current demand for electrical energy requires infrastructure additions to transmission
systems that are becoming larger and larger. A transmission system expansion planning
(TEP) is responsible for identifying necessary additions to the power system. However, this
process is difficult due to the number of variables to deal with. These variables are the result
of the number of candidate lines to consider (search space) in an optimization model. In this
paper, a candidate line clustering strategy is presented with the objective of reducing this
search space. This strategy combines unsupervised learning tools such as clustering and the
analysis of the operation of the Electric Power Supply System (ESS) called optimal power
flows. This combination is used to classify the candidate lines under 3 criteria: overload, least
effort and cost-benefit. These criteria are applied to each study system under analysis: Garver
6 Buses, IEEE 24 Buses and IEEE 188 Buses, to determine the most appropriate in each
case. All this in order to form and identify unrepresentative line groups to discard, resulting in
a new reduced search space for the systems and achieving a significant improvement in the
efficiency of the Transmission System Expansion Planning process.
0000-0002-8803-6811
2023-08-04T16:15:19Z
2023-08-04T16:15:19Z
2023-08-02
submittedVersion
http://dspace.ucuenca.edu.ec/handle/123456789/42589
spa
TE;506
Attribution-NonCommercial-NoDerivatives 4.0 Internacional
http://creativecommons.org/licenses/by-nc-nd/4.0/
openAccess
application/pdf
40 páginas
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/359502022-08-11T14:17:05Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Modelo de optimización multietapa para la planificación de la expansión de subestaciones del sistema de subtransmisión de la Empresa Eléctrica Regional Centro Sur C.A.
Cando Naula, Diego Jonnathan
Chuqui Cajamarca, Freddy Hernán
Sanango Fernández, Juan Bautista
Ingeniería Eléctrica
Optimización
Recursos energéticos
Energía eléctrica
Este trabajo de titulación presenta el desarrollo y aplicación de un modelo multietapa
coordinado para la planificación de la expansión de subestaciones (PES) con la
finalidad de determinar áreas de servicio y tiempos de ejecución de los proyectos
de expansión o construcción asociadas a dichas subestaciones de tal forma que
permitan atender a la demanda creciente cumpliendo con los requerimientos
técnicos y económicos. La función objetivo implementada para PES toma en
consideración los costos que se incurren por la construcción de los proyectos de
expansión, así como los costos por operación y mantenimiento incurridos en dichos
proyectos. Para el análisis de la mejor alternativa de expansión y su costo asociado,
este trabajo utiliza el método del valor presente, por otra parte, para reducir tiempos
de cálculo el algoritmo implementado hace uso de diferentes técnicas, entre la que
se destaca el análisis cluster cuyo objetivo es el de agrupar los nodos de carga de
tal manera de evitar el trabajo de PES con grandes conjuntos de datos dispersos
(nodos de carga) y en su lugar tratar con grupos cohesivos (clusters) que permitan
a cada uno de ellos generar un impacto representativo en el sistema. En cuanto a
las restricciones asociadas con la función objetivo se incluyen restricciones
eléctricas, como flujos de potencia, límites de variaciones de voltaje, límites de
cargabilidad y restricciones de radialidad, así mismo, el algoritmo también
contempla criterios de espacialidad y penalidad que ayudan a la asignación y
reducción de los cambios de clusters a otras subestaciones vecinas logrando así
determinar un área de servicio óptima asociada a las diferentes subestaciones en
análisis. Con el fin de establecer relaciones entre los aspectos económicos, técnicos
y espaciales, en este trabajo se hizo uso de los softwares Python, DIgSILENT, y
ArcGis que utilizados en conjunto generan una potente herramienta para PES y en
general para cualquier estudio que se pretenda abordar. Finalmente, el modelo y
los algoritmos propuestos fueron implementados en el sistema de subtransmisión
de la de la Empresa Eléctrica Regional Centro Sur C.A demostrando mediante los
resultados que la metodología empleada es una herramienta eficaz en sistemas
reales y a gran escala.
The next degree work, presents the development and application of coordinated This
degree work, presents the development and application of coordinated multi-stage
model to solving substation expansion planning (SEP) with the purpose of
determination service areas and implementation times substations expansion and
construction projects so that it allows serve the increasing electricity load demand in
accordance with certain technical and economic constraints. The objective function
implemented for solving SEP takes into consideration: the installed and/or reinforced
projects costs as well the installed and/or reinforced projects maintenance costs. To
analyze the best alternative solution and its associated cost, this work uses the
present value method. Moreover, to reduce calculation time, the algorithm has
implemented different techniques among which the cluster analysis stands out,
which objective is to group the load nodes to avoid the SEP process with large
dispersed data sets (nodes load) and instead deal with cohesive groups (clusters)
that allow to each one them generate a representative impact on the system. The
objective function includes different electrical constraints such as power flow,
changes to voltage level, maximum permissible loading of substations and radiality
constraints. In addition, the algorithm also contemplates spatial and penalty factors
that help to assignation and reduction clusters changes to other neighboring
substations allowing to determine an optimal service area associated to different
analysis substations. In order to establish relations between economic, technical and
spatial aspects, this work uses Python, DIgSILENT, and ArcGIS software which the
used together, generate a powerful tool for SEP and generally for any study that is
attempt to be achieved. Finally, the model and algorithms proposed were
implemented at the “Empresa Eléctrica Regional Centro Sur C.A” sub-transmission
system, and the results showed that the methodology used is an effective tool in real
and large-scale grids.
Ingeniero Eléctrico
Cuenca
2021-03-26T21:17:28Z
2021-03-26T21:17:28Z
2021-03-26
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/35950
spa
TE;476
Attribution-NonCommercial-NoDerivatives 4.0 Internacional
http://creativecommons.org/licenses/by-nc-nd/4.0/
openAccess
application/pdf
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/67042020-08-03T17:10:37Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Detección de fallas en cables subterráneos de distribución
Clavijo R., Patricio
Iñiguez S., Eugenio
León Córdova, Pedro
Cables Electricos
Energia Electrica
Canton Cuenca
Ingenieria Electrica
Se exponen conceptos fundamentales relacionados con cables subterráneos. Se exponen conceptos y procedimientos, para realizar el diseño y la ejecución de sistemas de distribución subterránea considerando métodos clásicos y métodos modernos. Se realiza el diagnóstico del sistema de distribución subterránea de Cuenca. El sistema en estudio sirve a la zona metropolitana de Cuenca, tiene alimentadores primarios a 6.3 Kv y al año 1990, tiene 34 años de servicio. El sistema presenta poca confiabilidad y debe ser sustituído por un nuevo sistema.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:18:03Z
2014-06-24T21:18:03Z
1990
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6704
spa
TE-88
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/284442018-07-13T20:18:21Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Evaluación del programa de mantenimiento preventivo de alumbrado público del cantón Cuenca de la Empresa Regional Centro Sur C.A.
Solórzano Jaramillo, Carlos Rodrigo
Pulla Galindo, Giovanni Santiago
Mantenimiento Predictivo
Empresa Electrica
Alumbrado Publico
El mantenimiento es el conjunto de todos aquellos trabajos, programados u ocasionales que permiten conservar el buen funcionamiento de una instalación y sus prestaciones, dentro de los límites que se consideran como convenientes en la fase de proyecto.
Tradicionalmente el mantenimiento se ha dividido en cinco (5) tipos, cada uno de ellos con características propias que los diferencian de los demás, estos tipos son: Mantenimiento Correctivo, Mantenimiento Preventivo, Mantenimiento Predictivo, Mantenimiento Cero Horas y Mantenimiento en uso, siendo el Mantenimiento Preventivo enfocado al sistema de Alumbrado Público del cantón Cuenca el centro de estudio y análisis del presente trabajo.
La Empresa Eléctrica Regional CENTROSUR C.A es la encargada de prestar el servicio de alumbrado público al cantón Cuenca y por ende, es la responsable de garantizar el buen funcionamiento del mismo, por lo tanto la CENTROSUR, cuenta con un Departamento de Iluminación, el cual se encarga de la revisión y reparación periódica de los dispositivos involucrados en tal sistema, estas tareas son realizadas bajo un plan de mantenimiento correctivo y preventivo, siendo necesario analizarlo y determinar posibles acciones que permitan una mejora continua.
El presente trabajo parte con el análisis de los indicadores y consideraciones que se debe tener en cuenta para una buena gestión del mantenimiento, para luego describir su organización y niveles jerárquicos, culminando con la evaluación del mantenimiento preventivo del sistema de alumbrado público en el cantón Cuenca en base a normativas nacionales e internacionales.
The maintenance is the set of all those works, scheduled or occasional to allow preserving the good operation of a facility and its benefits, within the limits that are considered as convenient in the project phase.
Traditionally maintenance has been divided into five (5) types, each with their own characteristics that differentiate them from the others, these types are Corrective Maintenance, Preventive Maintenance, Predictive Maintenance, Maintenance Zero Hours and Maintenance in use, with Preventive Maintenance being focused to the system of Public Lighting of the Cuenca canton the center of study and analysis of the present work.
The Central Electric Company CENTROSUR CA is responsible for providing the public lighting service to the Cuenca canton and therefore, is responsible for ensuring the proper functioning of the same, therefore the CENTROSUR, has a Department of Lighting, which is in charge of the periodical review and repair of the devices involved in such a system, these tasks are carried out under a corrective and preventive maintenance plan, being necessary to analyze it and determine possible actions that allow a continuous improvement.
The present work starts with the analysis of the indicators and considerations that must be taken for a good maintenance management, to then describe its organization and hierarchical levels, culminating with the evaluation of the preventive maintenance of the public lighting system in the Cuenca canton based on national and international recommendations.
Ingeniero Eléctrico
Cuenca
2017-11-06T15:56:36Z
2017-11-06T15:56:36Z
2017
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/28444
spa
TE;403
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66632020-08-03T17:10:17Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Diseño de redes de distribución áreas para la ciudad de Cuenca por medio de una computadora digital
Córdova C., Patricio
Pesántez A., Patricio
Cordero Díaz, Eugenio
Energia Electrica
Redes Electricas
El objetivo de esta tesis es el diseño de redes de distribución optimizada mediante el uso de ciertos algoritmos de programación lineal, aplicado para la ciudad de Cuenca. Se estudia los métodos de programación lineal para luego presentar un programa digital para finalmente utilizarlos en el diseño de la lotización Villa Nueva, la cual consta de 85 lotes y una área de 18082 m2, se describe la forma de realizar el diseño con los datos obtenidos en el programa
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:55Z
2014-06-24T21:17:55Z
1986
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6663
spa
TE-49
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66712020-08-03T17:10:19Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Estudio de alimentadores para el núcleo urbano de la ciudad de Cuenca
Guancay A., Bolívar
Verdugo, Edgar M.
Chérrez Tamayo, Antonio
Transmision Electrica
Alimentadores
Ingenieria Electrica
El objetivo de esta tesis es dotar a la E.E.R.C.S. de un estudio general de los alimentadores del núcleo urbano de la ciudad de Cuenca, con el fin de saber la ubicación de amplificaciones y reubicaciones, etc. Para el estudio se considera la aplicación sobre un barrio típico de la ciudad de Cuenca. Se determina el valor de la demanda máxima unitaria, la carga instalada del consumidor de máximas posibilidades. Finalmente se hace una proyección de la demanda y un cálculo económico del proyecto
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:56Z
2014-06-24T21:17:56Z
1981
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6671
spa
TE-57
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/273412020-08-03T17:12:35Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Proyección espacial de la demanda en la Empresa Eléctrica Regional Centro Sur C.A. mediante el método de simulación espacio-temporal
Chumbi Quito, Wilson Enrique
Patiño Chitacapa, César Andrés
Salgado Rodríguez, Modesto
Zambrano Asanza, Sergio Patricio
Quituisaca Astudillo, Patricio
Empresa Electrica
Demanda Electrica
Clientes
Distribucion Electrica
Modelo Espacio Temporal
El presente Trabajo de Titulación describe la aplicación de un modelo espacio-temporal de proyección espacial de la demanda eléctrica sobre una base de cuadrículas, aplicado en respuesta a un problema de planificación de mediano y largo plazo del Sistema de Distribución Eléctrica de la Empresa Eléctrica Regional Centro Sur C.A.
El modelo de proyección consta de tres componentes principales que corresponden al módulo global, temporal y espacial. El módulo global determina la cantidad de nuevos clientes para un determinado período de tiempo. El módulo espacial combina el interés de un cliente para encontrar un espacio de terreno que cumpla con ciertas características de uso del suelo, con espacios vacantes atractivos para dichos clientes. El módulo espacial analiza factores locales, de proximidad y entorno para cada clase de uso de suelo, determinando en base a sus atributos cuan atractiva es una cuadrícula para el desarrollo de clientes.
El resultado del módulo espacial es un mapa de preferencias cuadriculado, donde cada cuadrícula tiene una preferencia de ser elegida para su desarrollo en función del uso del suelo. El módulo temporal determina las curvas de carga y consumo per-cápita para cada tipo de cliente establecido. El crecimiento obtenido por el módulo global es asignado entre las cuadrículas de mayores preferencias y convertido en demanda eléctrica con el módulo temporal, definiendo de esta manera la magnitud de la demanda en un área específica para cada etapa del periodo de estudio.
The present study presents the process of a spatial load forecasting model based in a regular grid base, applied in response to a medium and long range planning problem of the Electrical Distribution System of the Regional Electric Company Centro Sur CA.
The proposed forecast model consists of three main modules that correspond to the global, temporal, and spatial module. The global module controls the global development that is the sum of all developments in the region for every time step. The spatial module is pattern recognition used to identify a match between customers’ preferences and parcels regarding the characteristics of the land they are finding. The spatial module is based on several local, proximity, and surround factors for each land use classes, thus computing a continuous map of potential for development based on its local attributes, i.e. estimating the suitability of every small area for customer growth.
The result of the spatial module is a map of potential for development based in small areas, where each small area has a preference based on influence factors. The temporal module determines the load curves and consumption per-capita for each type of customer set. The growth obtained from the global module is spread into the small areas with the highest preference over the geographical region, and then converted into electrical load with the temporal module. The result represents the effective development of consumer growth, thus defining the magnitude of the load in a specific area along each time stage.
Ingeniero Eléctrico
Cuenca
2017-05-09T12:13:18Z
2017-05-09T12:13:18Z
2017
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/27341
spa
TE;398
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/67052020-08-03T17:10:39Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Factibilidad de servicio eléctrico a la parroquia el Carmen de Pijilí
Inga G., Carlos
Marín G., Jorge
Ortega Delgado, Iván
Parroquia El Carmen De Pijili
Energia Electrica
Se emiten criterios para dotar de servicio eléctrico a las localidades de la parte alta de la parroquia El Carmen de Pijilí (perteneciente a Santa Isabel) mediante dos alternativas: con una microcentral hidráulica o interconectándola al sistema Eléctrico El Oro a través de la ampliación del alimentador Tenguel-Balao. Se realiza un estudio de proyección de la demanda. Se hace un análisis técnico-económico de las dos alternativas y se elige como mejor alternativa la ampliación del alimentador Tenguel-Balao. Se realiza el diseño del ramal del alimentador citado.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:18:03Z
2014-06-24T21:18:03Z
1990
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6705
spa
TE-89
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/421202023-06-13T15:50:55Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Planeamiento de expansión de los sistemas de distribución eléctrica mediante el uso de un algoritmo voraz
León Brabo, Bryam Remigio
Torres Contreras, Santiago Patricio
Electricidad
Corriente alterna
Sistema de distribución
CIUC::Ingenierías::Ingeniería Eléctrica::Aplicaciones Eléctricas
Una adecuada planificación de un sistema de distribución de energía eléctrica es crucial para
garantizar que los consumidores serán provistos de una energía de calidad. A lo largo del
siglo pasado y en comienzos del presente, la planificación de los sistemas de distribución se
realizaba de forma rudimentaria, sin métodos de solución matemáticos. Paulatinamente la
planeación de la expansión de sistemas de distribución usando métodos de optimización ha
ofrecido resultados eficaces y confiables. Mediante el presente artículo se presenta una
innovadora alternativa de expansión de sistemas de distribución mediante el uso de
algoritmos de búsqueda local y solución aleatoria. El método aplicado ha generado resultados
eficaces que han sido validados en un sistema de distribución de 54 nodos.
An adequate planning of an electric power distribution system is crucial to ensure that
consumers will be provided with quality energy. Throughout the last century and the beginning
of the present one, distribution system planning was carried out in a rudimentary manner,
without mathematical solution methods. Gradually, the planning of distribution system
expansion using optimization methods has offered effective and reliable results. This article
presents an innovative alternative for distribution system expansion through the use of local
search algorithms and random solution. The applied method has generated effective results
that have been validated in a 54-node distribution system.
0000-0002-8803-6811
2023-06-13T15:50:53Z
2023-06-13T15:50:53Z
2023-06-09
submittedVersion
http://dspace.ucuenca.edu.ec/handle/123456789/42120
spa
TE;504
Attribution-NonCommercial-NoDerivatives 4.0 Internacional
http://creativecommons.org/licenses/by-nc-nd/4.0/
openAccess
application/pdf
24 páginas
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/6952020-08-03T17:08:25Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Normalización y especificaciones técnicas para la adquisición de equipos y materiales para distribución y subtransmisión de energía eléctrica
González Suquilanda, Juan Teodoro
Saquicilí Cueva, Carmen Amelia
Ugalde Delgado, Juan Hernando
Ingenieria Electrica
Empresa Electrica
Subtransmision
Normalizacion
Las empresas cada día incrementan su competitividad mediante un correcto control de sus tareas buscan optimizar el empleo de sus recursos. Disponer de procesos exigidos en la ley y de especificaciones técnicas de equipos y materiales a adquirirse permite que las actividades necesarias se realicen en menor tiempo cumpliendo normas y requisitos técnicos necesarios. El presente trabajo contiene la Normalización y Especificaciones Técnicas para la Adquisición de Equipos y Materiales para Distribución y Subtransmisión de Energía Eléctrica. Se detalla además tablas con las especificaciones técnicas, fotografías y planos de los diferentes equipos y materiales de uso frecuente de la Empresa Eléctrica Regional Centro Sur.
Ingeniero Eléctrico
Cuenca
2013-06-05T14:54:24Z
2013-06-05T14:54:24Z
2010
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/695
spa
TE;300
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/54332020-08-03T17:07:18Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Evaluación de sistemas fotovoltaicos con hidroseguidores
Bueno Guartazaca, Pablo Efraín
García Renté, Manuel
Seguidor Solar
Hidromotores
Hidroseguidores Solares
Sistemas Fotovoltaicos
El Ecuador es uno de los países privilegiados debido a que posee una radiación solar muy elevada que puede ser aprovechada para la generación de energía eléctrica siendo este su principal objetivo Sin embargo este gran potencial no estaría completo si no la complementamos con agua que es un recurso muy abundante ya que el Ecuador es uno de los países que posee más agua dulce por m2 a nivel superficial.
Entonces el propósito de este trabajo de graduación es aprovechar estos recursos abundantes que tiene el ecuador motivo por cual he elaborado un seguidor solar que trabaja mediante hidroseguidores solares que son sistemas conformados por una pareja de motores hidráulicos programados por hardware el cual es un sistema hidromecánico conformado por dos recipientes iguales con flotadores viajeros iguales conformado por un recipiente a mayor altura que controla el descenso de un flotador con carga durante la descarga libre del agua a otro recipiente (igual al anterior) a menor altura que recibe por gravedad al agua del primer recipiente y se produce el ascenso del segundo flotador con carga ambos flotadores viajan a velocidad constante y en sentido contrario produciéndose el seguimiento de un fotocaptador sincrónico con el movimiento del sol.
The Ecuador is one of the privileged countries since it has a very high solar radiation can be exploited for electricity generation being its main objective however this great potential would not be complete if we do not complement it with water that is a resource very abundant since the Ecuador is one of the countries that has more freshwater per m2 at surface level.
Then the purpose of this work of graduation is to leverage these abundant resources that has the reason Ecuador which I have developed a solar Tracker that works by solar hidroseguidores which are systems consisting of a pair of hydraulic motors programmed hardwarewhich is a hydro-mechanical system consisting of two equal containers with floats equal travelers consisting of a container higher controlling the descent of a float charged during the free water discharge to another container (as above) to lower height that receives by gravity to the water from the first container and there is the rise of the second float with cargo both floats travel at constant speed and counterclockwise, producing the follow-up of a with the movement of the Sun synchronous fotocaptador.
Ingeniero Eléctrico
Cuenca
2014-04-16T14:12:46Z
2014-04-16T14:12:46Z
2014
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/5433
spa
TE;361
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/6732020-08-03T17:07:53Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Regulación para incentivar las energías renovables en Ecuador
Espinoza Vanegas, Josué Eudoro
León Ortiz, Jorge Gustavo
Barragán Escandón, Edgar Antonio
Energia Renovable
Energia No Renovable
Potencia Electrica
Matriz Energetica
En este trabajo de graduación se estudia la importancia de la energía eléctrica en la sociedad actual, se indica las fuentes de energía dividida en dos análisis: energía renovable y no renovable. Además se hace una breve descripción de los diferentes tipos de energía, así como el aprovechamiento y desarrollo de la energía renovable, con proyectos que se encuentran en ejecución o en fase de estudio en el Ecuador. A continuación se recopila la normativa vigente, que incentiva el uso de recursos renovables no convencionales, publicada en Ecuador, Perú y Colombia, así mismo se indica el estado actual del sector eléctrico de los países bajo estudio, indicando sus respectivas matrices energéticas elaboradas con datos estadísticos publicados por las entidades responsables. Además se indica los principales recursos utilizados para la generación de energía eléctrica. Luego se realiza la clasificación de las diferentes teorías regulatorias, mas utilizadas en Latinoamérica, con una descripción conceptual de cada una de ellas, con esta información se clasifica las normativas vigentes y se establece una comparación entre Ecuador y sus países vecinos Perú y Colombia. Como punto mas importante de este trabajo se realiza las propuestas de normativa para incentivar la generación de electricidad con fuentes de energía renovable no convencional, basados en un análisis de Fortalezas, Oportunidades, Debilidades, Amenazas FODA el cual nos permite determinar prioridades para tomar decisiones y sugerir propuestas de normativa que podrían ejecutarse en Ecuador y con esto lograr una mayor participación de la energía renovable no convencional en la matriz energética.
Ingeniero Eléctrico
Cuenca
2013-06-05T14:54:20Z
2013-06-05T14:54:20Z
2012
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/673
spa
TE;340
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/360442021-04-19T08:01:03Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis técnico y económico para la implementación de sistemas de generación solar fotovoltaica para autoabastecimiento en la planta industrial y granja porcícola de la Empresa Italimentos CIA. LTDA
Aguilar Ramón, Jimmy Andrés
Illescas Barreto, Walter Sebastián
Espinoza Abad, Juan Leonardo
González Morales, Luis Gerardo
Ingeniería Eléctrica
Energías renovables
Generación fotovoltaica
Energía solar
Este trabajo de titulación expone el estudio tanto técnico y económico que supone la
implementación de sistemas de generación solar fotovoltaica conectados a la red (SFVCR), los
cuales tienen como finalidad el autoabastecimiento de la demanda energética de dos instalaciones
pertenecientes a la empresa Italimentos CIA. LTDA; la primera, en la planta industrial ubicada
en la ciudad de Cuenca, provincia del Azuay y la segunda en la granja porcícola que se encuentra
establecida en las cercanías del cantón Santa Rosa, provincia del El Oro.
Como punto de partida se analiza la Regulación Nro. ARCONEL 003/18, la cual fue actualizada
mediante la resolución Nro. ARCONEL- 057/18 emitida por la Agencia de Regulación y Control
de Electricidad; las cuales, a la fecha de publicación de este documento, es la que establece las
condiciones para el desarrollo, implementación y participación de consumidores regulados que
cuenten con un sistema de generación solar fotovoltaica en el Ecuador. Luego, se realiza la
caracterización de la demanda eléctrica en las áreas de estudio a través de mediciones realizadas
con un equipo especializado, tratando de conocer el impacto que pueden llegar a tener los sistemas
propuestos en las instalaciones de la empresa. Siguiendo con el estudio, se define el recurso solar
existente en las zonas de interés, a través de fuentes meteorológicas locales e internacionales, para
realizar el análisis técnico para la implementación de los sistemas buscando obtener la mayor
eficiencia y rendimiento posibles considerando parámetros que influyen en la caracterización de la
producción de energía solar fotovoltaica. Luego, con los resultados obtenidos en el análisis técnico,
se realiza la estimación del costo de inversión inicial para los proyectos, tomando como referencia
precios de revistas internacionales especializadas en energías renovables publicadas por la Agencia
Internacional de Energías Renovables (IRENA por sus siglas en inglés) y Laboratorio Nacional de
Energías Renovables (NREL por sus siglas en inglés), que servirán como base para determinar la
viabilidad económica-financiera evaluada bajo diferentes escenarios de financiamiento.
Finalmente, se exponen los beneficios, fiscal y ambiental, con los que la empresa se puede favorecer
al implementar proyectos que incentiven el uso de energías renovables y la eficiencia energética
This titling work presents the technical, economic, and environmental study that involves the
implementation of photovoltaic solar generation systems grid connected, which are intended to
self-supply the energy demand of two facilities belonging to the Italimentos limited company; the
first, in the industrial plant located in Cuenca city, Azuay province and the second in the pig
farm that is located near to Santa Rosa, El Oro province.
As a starting point, Regulation No. ARCONEL 003/18, updated through Nro. ARCONEL- 057/18
resolution, issued by the Electricity Regulation and Control Agency, is analyzed, which, as of the
date of publication of this document, is the one that establishes the conditions for the
development, implementation and participation of regulated customers that have a photovoltaic
solar generation system in Ecuador. Then, the characterization of the electricity demand in the
study areas is carried out through measurements carried out with a specialized energy analyzer,
trying to know the impact that the proposed systems may have on the company's areas.
Subsequently, after defining the existing solar resource in the areas of interest, through local and
international meteorological sources, the technical analysis is carried out for the implementation
of the systems seeking to obtain the highest possible efficiency and performance considering
parameters that influence in the characterization of solar photovoltaic energy production. Then,
with the results obtained in the technical analysis, the initial investment cost estimate for the
projects is made, taking as a reference detailed prices in updated international bibliographic
sources, which will serve as a basis to determine the economic-financial viability evaluated under
different financing scenarios. Finally, the fiscal and environmental benefits are exposed, with
which the company can benefit when implementing projects that incentivize the use of renewable
energies and energy efficiency
Ingeniero Eléctrico
Cuenca
2021-04-16T12:44:31Z
2021-04-16T12:44:31Z
2021-04-16
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/36044
spa
TE;481
Attribution-NonCommercial-NoDerivatives 4.0 Internacional
http://creativecommons.org/licenses/by-nc-nd/4.0/
openAccess
application/pdf
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/67062020-08-03T17:10:36Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Optimización del consumo de energía eléctrica aplicada a la fábrica de Cementos Guapán
Barrera G., Vicente
Martínez L., Guillermo
Neira Moscoso, Jaime Marcelo
Energia Electrica
Ingenieria Electrica
El objetivo de la tesis es mantener la demanda facturable de la fábrica Guapán lo más bajo que sea posible para lo cual entre otras actividades se puede hacer: 1.-Conectar un mayor número de bloques de energía de 21h00 a 06h00 que de 06 a 21 h00m, debido a que en este período el costo del KWH es menor. 2.-Se debe procurar que la demanda máxima de la fábrica no coincida con las horas pico de la E.E.R.C.S. 3.-Restringir el uso de los generadores térmicos existentes sólo para casos de emergencia. 4.-Tener una tensión de servicio general a 69 KV.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:18:03Z
2014-06-24T21:18:03Z
1990
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6706
spa
TE-90
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65352020-08-03T17:09:21Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Guía de desarrollo telefónico EMETEL Regional-3 hasta el año 2010
Villavicencio Vega, Valeria
Abad T., Pedro
Merchán Manzano, Hernando Efraín
Red Telefonica
Ingenieria Electrica
Sistemas De Comunicacion
Consiste en una guía de desarrollo telefónico para EMETEL R-3, desde 1990 hasta el año 2010. En el diagnóstico abarca las diferentes áreas técnicas de la Empresa, así como la proyección y crecimiento de la infraestructura existente. La empresa en su departamento de planificación dispondrá de una base de datos elaborada en fox-pro, para el diagnóstico y la proyección de su infraestructura, incluyendo proyección y crecimiento tanto de la población cuanto de la demanda telefónica, en la regional-3
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:42Z
2014-06-24T21:17:42Z
1977
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6535
spa
TE-200
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/67132020-08-03T17:12:32Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Diseño de redes telefónicas secundarias para parroquias sub-urbanas del cantón Cuenca
Alvarez Idrovo, Iván
Jerves Iñiguez, Rubén
Telecomunicaciones
Red Telefonica
La tesis realiza un diseño de redes telefónicas secundarias para las parroquias San Joaquín, Ricaurte, Baños y El Valle del Cantón Cuenca. Los pasos que se siguen para tal trabajo son: Definición del área geográfica a servirse, actualización de planos, trazado de áreas o zonas de influencia y ubicación de cajas de dispersión, trazado de la red secundaria y escogitamiento del calibre del conductor. Se presenta el estudio, se determina las necesidades telefónicas actuales, se diseña la red telefónica secundaria y se determina costos de la obra.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:18:04Z
2014-06-24T21:18:04Z
1990
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6713
spa
TE-97
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/360562021-06-15T14:18:51Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis y diseño para la reconfiguración de los alimentadores 221 y 223 de la Empresa Eléctrica Azogues C. A.
Reinoso Quinteros, Johnny Gabriel
Castro Morales, Washington Abel
Dután Amay, Walter Javier
Quezada Morales, Diego Armando
Ingeniería Eléctrica
Recursos energéticos
Automatización
Distribución energética
La Empresa Eléctrica Azogues C.A. en el continuo mejoramiento de sus redes de distribución,
tiene implementados dispositivos inteligentes como relés y reconectadores que se mantienen
en constante comunicación con el Centro de Control mediante el envío y recepción de señales
analógicas y digitales, esta comunicación le permite al operador tener un conocimiento en
tiempo real de la situación de la red y realizar maniobras en caso de presentarse alguna
contingencia para reestablecer el servicio a la mayor cantidad de usuarios afectados. Debido a
que la Empresa no cuenta con sistemas automáticos de control, estas incidencias afectan de
manera negativa a la calidad del servicio técnico de la distribuidora ya que requieren de un
tiempo prolongado para que los tramos fallados sean aislados de la red y la carga de los tramos
sanos se restablezcan mediante la transferencia hacia otro alimentador.
En el presente trabajo se analizó las condiciones normales de operación de la red conformada
por los alimentadores 221 y 223 de la distribuidora, con el fin de identificar las variables
necesarias para desarrollar un algoritmo de reconfiguración automática para el sistema en
estudio, utilizando las señales digitales y analógicas que se obtienen de los dispositivos de
protección como relés y reconectadores; la ejecución del algoritmo, luego de realizar una
comprobación de señales, evalúa los distintos escenarios de falla y al cumplir las condiciones de
alguno de ellos ejecuta mandos que permitan aislar el tramo fallado y de ser posible transferir
el tramo sano hacia el otro alimentador.
Empresa Eléctrica Azogues C.A. in the continuous improvement of its distribution networks, has
implemented intelligent devices such as relays and reclosers that are in constant communication
with the Control Center by sending and receiving analog and digital signals, this communication
allows the operator to have real-time knowledge of the situation of the network and perform
maneuvers in case of any contingency to restore service to the largest number of affected users.
Since the Company does not have automatic control systems, these incidents negatively affect
the quality of the technical service provided by the distribution company, since they require a
long time for the failed sections to be isolated from the network and the load of the healthy
sections to be reestablished by transferring them to another feeder.
In this work, the normal operating conditions of the network formed by feeders 221 and 223 of
the distribution company were analyzed in order to identify the necessary variables to develop
an automatic reconfiguration algorithm for the system under study, using the digital and analog
signals obtained from the protection devices such as relays and reclosers; The execution of the
algorithm, after performing a signal check, evaluates the different failure scenarios and when
the conditions of any of them are met, executes commands that allow isolating the failed section
and if possible transferring the healthy section to the other feeder.
Ingeniero Eléctrico
Cuenca
2021-04-19T21:07:24Z
2021-04-19T21:07:24Z
2021-04-19
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/36056
spa
TE;483
Attribution-NonCommercial-NoDerivatives 4.0 Internacional
http://creativecommons.org/licenses/by-nc-nd/4.0/
openAccess
application/pdf
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/65782020-08-03T17:09:41Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Programa de uso eficiente de energía aplicado a la fábrica Cerámica Andina C.A.
Guapisaca V., Fabián
Enríquez V., Wilson
Viteri Salazar, Hugo
Iluminacion
Motores
Energia Electrica
Ingenieria Electrica
En vista del incremento del costo de utilización de energía, es imprescindible establecer un programa para un uso eficiente de energía, con la finalidad de disminuir los costos de producción. Tenemos como objetivos generales, controlar las pérdidas de energía existentes en la fábrica y utilizar eficientemente la energía en las máquinas existentes. Como objetivos específicos tenemos: Averiguar dónde y cómo se usan los diferentes tipos de energía, llevar a cabo una auditoría energética y establecer el programa de uso frecuente. El análisis estará dirigido a los siguientes tipos de energía: eléctrica, térmica y neumática
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:46Z
2014-06-24T21:17:46Z
2000
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6578
spa
TE-238
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/7022020-08-03T17:07:52Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Despacho económico ambiental de unidades de generación térmicas
Peralta Pesántez, Paúl Patricio
Silva Cartuche, Eddy Manuel
Barragán Escandón, Edgar Antonio
Gases Contaminantes
Centrales Termicas
Gestion Ambiental
En el desarrollo del presente trabajo lo que pretende es estudiar a nivel teórico el despacho económico ambiental de unidades térmicas de generación de energía eléctrica, para lo cual se detalla aspectos básicos acerca de las leyes vigentes y tecnologías para disminuir las emisiones en el país, así como también la reglamentación vigente para el despacho económico. Se sustenta la base teórica del problema de despacho económico con sus respectivas ecuaciones y restricciones, también se analiza las diferentes curvas características que representan a las unidades de generación como función de entrada salida, función de costos, costos marginales. En base a bibliografía analizada, se propone un modelo de despacho económico ambiental, en el cual se pueda incluir tanto los costos del combustible, como la cantidad de emisiones. Con los resultados obtenidos de los cálculos realizados en el modelo de despacho propuesto, se presentan gráficas a fin de comparar las características particulares del despacho económico convencional y el despacho económico con restricción de emisiones.
Ingeniero Eléctrico
Cuenca
2013-06-05T14:54:26Z
2013-06-05T14:54:26Z
2012
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/702
spa
TE;333
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/212672020-08-03T17:08:01Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Incidencia del programa 'cocción eficiente' en la demanda máxima unitaria en el sector residencial rural de la ciudad de Cuenca
Orellana Uguña, Carlos Mauricio
Pañi Uguña, Marcos Iván
León Córdova, Pedro
Machado Solís, Santiago
Avila Campoverde, Ramiro
Transmision De Energia
Coccion Eficiente
Ecuador
Canton Cuenca
La Empresa Eléctrica Regional Centro Sur, al ser la Empresa prestadora del servicio de energía eléctrica, ha visto la necesidad de determinar el nivel de incidencia que trae la introducción de las cocinas a inducción en el área rural de la ciudad de Cuenca. Es por esta razón que la presente tesis tiene como objetivo determinar los Factores de Coincidencia, que ayudará a determinar la incidencia del programa de Cocción Eficiente en la Demanda Máxima Unitaria en el sector residencial rural de la ciudad de Cuenca.
El primer capítulo engloba los antecedentes, alcance, justificación y objetivos en el cual se indican las razones del desarrollo de este tema, además se indican las zonas de cobertura por parte de la Empresa Eléctrica.
En el segundo capítulo se indican diferentes métodos utilizados por las Empresas Destruidoras para el cálculo de las Cargas Instaladas, Demanda Máxima Unitaria, etc.
En el tercer capítulo se indica los resultados obtenidos a través de las encuestas realizadas sobre las costumbres de cocción de alimentos.
En el cuarto capítulo se centra el desarrollo de este trabajo monográfico, ya que en esta se indica en detalle los pasos que se siguen.
En el quinto capítulo se realiza la justificación de los datos obtenidos mediante la comparación con nuevas encuestas realizadas, además se indican las ecuaciones respectivas pertenecientes a los del Factor de Coincidencia, Demanda Diversificada y Demanda Máxima Unitaria de las cocinas a inducción
Y finalmente se indican las conclusiones y recomendaciones pertinentes.
The Electric Company Regional Centro Sur, at be the Company, provider of electric service, has seen the need to determine the level of impact that brings the introduction of induction cookers in rural areas of the city of Cuenca. It is for this reason that this thesis have how objetive determine Coincidence Factors that help determine the impact of the program Efficient Cooking, in the Maximum unitary demand, in the rural residential area of the city of Cuenca.
The first chapter covers the background, scope, justification and objectives in which indicate the reasons for developing this theme, also be show coverage areas by part the Electric Company.
In the second chapter be show different methods used by Distribution Company for calculating charges Installed, , etc.
In the third chapter be show the results through surveys made about the customs of cooking food.
In the fourth chapter develops the monograph detailing the steps followed.
In the fifth chapter we do the justification the data obtained through comparisons with new surveys, further we show the equations of Coincidence Factor, Diversified Demand and Maximum Unitary Demand of the Induction Cookers.
And finally the conclusion and recommendations are given.
Ingeniero Eléctrico
Cuenca
2015-02-12T13:24:26Z
2015-02-12T13:24:26Z
2015
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/21267
spa
TE;377
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65202020-08-03T17:09:16Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Sistema de alumbrado público de la ciudad de Cuenca
Pozo M, Freddy
Vimos M., Guillermo
Viteri Salazar, Hugo
Alumbrado Publico
Canton Cuenca
Ingenieria Electrica
Se recopila la información del alumbrado público de la ciudad de Cuenca, en el período 1977-1980, realizandose una medición de los niveles lumínicos en diversos sectores, para luego compararlos con los mínimos requeridos y si se justifica realizar un cambio de los sistemas de iluminación. Se estudia también los sectores en los que se va a ampliar el servicio. En el primer tomo se analizan conceptos y en el segundo se realiza el proyecto de electrificación de la Avenida de las Américas
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:40Z
2014-06-24T21:17:40Z
1981
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6520
spa
TE-18
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64652020-08-03T17:08:46Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Estudio de cortocircuito y coordinación de protecciones de los alimentadores principales de la subestación no. 4 de la ciudad de Cuenca
Sánchez Granda, Jaime
Salgado Rodríguez, Modesto
Carrasco Toral, Jaime
Cortocircuitos
Subestacion
Canton Cuenca
Alimentadores
Se realiza un cálculo de las corrientes de falla, la ubicación y selección de protecciones y la coordinación de las mismas, el alimentador de distribución radial No. 44, que pertenece a la subestación No. 4. La fecha a la que corresponden los datos expuestos en esta tesis es Mayo de 1979. Al final se realiza un análisis de la proyección y demanda que el alimentador en estudio podría seguir dando servicio
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:31Z
2014-06-24T21:17:31Z
1980
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6465
spa
TE-13
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64842020-08-03T17:08:58Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Diagnóstico y planificación del sistema de Alumbrado Público de la ciudad de Loja
Guananga M., Galo O.
Paute C., Jorge E.
Viteri Salazar, Hugo
Sistemas De Alumbrado
Canton Loja
Energia Electrica
Se exponen normas para diseñar sistemas de Alumbrado Público. Se aplica al Alumbrado Público de Loja realizando el diagnóstico y la planificación del mismo. De las mediciones efectuadas se puede decir que salvo pocas excepciones los niveles de iluminación y los factores de uniformidad son deficientes, (Alumbrado Público existente). El sistema de mantenimiento del Alumbrado Público no es óptimo, por lo que se recomienda dar un mantenimiento periódico, reemplazar oportunamente elementos fallados, realizar la limpieza, comprobar el funcionamiento a tensión nominal, etc.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:34Z
2014-06-24T21:17:34Z
1994
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6484
spa
TE-153
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/216522020-08-03T17:11:20Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Eficiencia energética en el alumbrado público del Centro Histórico de Cuenca: telegestión y sustitución de luminarias
Chabla Auqui, Luis Leonardo
Córdova Erráez, Danny Fernando
Cabrera Albornoz, Fabián
Sistema De Iluminacion
Alumbrado Publico
Hardware
Energia Electrica
Sistemas De Control
Canton Cuenca
Con el incremento de la población, la demanda de energía es cada vez mayor, por lo que es necesario buscar nuevas alternativas de ahorro energético, incursionando en nuevas tecnologías que permitan minimizar el consumo de energía sin que ésta afecte en la calidad del servicio.
El presente trabajo tiene como objetivo determinar el impacto energético en el alumbrado público del centro histórico de la ciudad de Cuenca, en el cual se plantea la sustitución de un nuevo sistema de alumbrado con luminarias de tecnología led y la implementación de redes de telegestión.
En los capítulos 1 y 2 se muestran los principios, conceptos, fenómenos y normas que rige la luminotecnia. También se da a conocer los diferentes tipos de luminarias para alumbrado público, equipos auxiliares y lámparas. Además se analiza la tecnología led, funcionamiento, clasificación y los avances tecnológicos de los dispositivos de iluminación led en el alumbrado.
En el capítulo 3 se expone los factores que determinan una instalación de alumbrado público. También se realiza el estudio del sistema actual, determinado así las condiciones de iluminación que presentan las vías del centro histórico de Cuenca. Asimismo se implementa la nueva red de iluminación con tecnología led, estableciendo parámetros comparativos entre los dos sistemas.
En el capítulo 4 se describen y se realiza un análisis de sistemas de control mediante telegestión aplicable al alumbrado público del centro histórico de la ciudad de Cuenca.
Finalmente el capítulo 5 presenta los criterios, conclusiones, recomendaciones y resultados obtenidos de los capítulos antes mencionados.
ABSTRACT
The continued increase in both population and energy demand necessitates the importance of seeking alternative energy sources that minimize the consumption of energy with no reduction in the quality of service.
The present work has as its objective to determine the energy impact of public lighting in Cuenca’s historic district through the substitution of the current public lighting system with new led technology and the implementation of an integrated remote system.
In chapters 1 and 2 the principles, concepts, phenomena and standards that govern lighting are explained. Also different types of public lighting, auxiliary equipment and street lights are examined. Additionally the basis of led technology, its classification and advancements in devices for public lighting that use led technology will be analyzed.
Chapter 3 explores pertinent factors regarding a public lighting facility. An examination of the present lighting system is then carried out with special attention given to street lighting in Cuenca’s historic district. An opposing system of networked street lighting based upon led technology is then presented to establish comparative parameters between the two systems.
In chapter 4 a description and analysis of control systems through the use of integrated remote systems applicable to public lighting in Cuenca’s historic district is given.
Finally, chapter 5 presents criteria, conclusions, recommendations and obtained results from the aforementioned chapters.
Ingeniero Eléctrico
Cuenca
2015-04-17T13:06:13Z
2015-04-17T13:06:13Z
2015
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/21652
spa
TE;382
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/348782020-10-19T08:01:01Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Manual de procedimientos para la construcción de las redes eléctricas subterráneas para la Empresa Eléctrica Ambato Regional Centro Norte S.A.
Campozano Tuba, Jaime Patricio
Tubón Capuz, Stalin Daniel
León Córdova, Pedro Alejandro
Astudillo Salinas, Patricio Alcides
Ingeniería Eléctrica
Construcción
Redes eléctricas
En este trabajo de titulación se presenta un manual de construcción para redes eléctricas subterráneas en el área de concesión de la Empresa Eléctrica Ambato Regional Centro Norte S.A., teniendo en cuenta las normativas propias de la empresa y las regulaciones establecidas para la construcción de redes eléctricas subterráneas. Para el montaje y construcción de estas redes no se tiene un manual específico o una guía preestablecida, en el que, los constructores puedan guiarse, razón por la cual se presenta este trabajo de titulación que servirá de gran ayuda. En primera instancia se comenzará por la obra civil, en esta parte se tomará en cuenta las consideraciones básicas de construcción de canalizaciones, cámaras y pozos de revisión. Se realizará una descripción breve, de las normas y condiciones técnicas vigentes para proceder a la construcción de la obra eléctrica.
En el segundo punto se tratará sobre la construcción de la obra eléctrica en la que se toman en cuenta aspectos como: los conductores que se utilizarán tanto para medio como bajo voltaje, se tendrán en cuenta las pruebas a las que deben ser sometidas las instalaciones construidas, previa su puesta en operación. En cuanto a los elementos para montaje se tendrá los accesorios aislados, como son: puntas terminales, Bushing Insert, barras de derivación, empalmes y conectores, los mismos que son de suma importancia para tener éxito en la obra. Para los transformadores se tomará las normas respectivas para las redes eléctricas subterráneas teniendo en cuenta que estos están normados.
Se tomará en cuenta los equipos de maniobra y protección, siendo estos equipos ideales para proteger la instalación y evitar daños mayores que traerán consigo un costo mayor en cuanto a detección de la falla y su reparación, cómo parte final se tratará sobre el montaje y descripciones técnicas para el alumbrado público.
In this thesis, a construction manual for underground electrical networks in the concession area of the Ambato Regional Centro Norte Electric Company, Inc. is presented. This work will take into account the company's own regulations and the regulations already established for the construction of underground electrical networks. There is no specific manual or a pre-established guide for the assembly and construction of these networks; that is why this guide, which will be of significant help, is offered.
Civil works will begin in the first instance. In this part the basic considerations of construction of pipelines, chambers and monitoring wells will be taken into account.
A brief description of the current technical standards and conditions to proceed with the construction of the electrical work will be made.
A second part will deal with the construction of the electrical work in which some aspects such as the conductors that will be used for both medium and low voltage as well as the tests which the electrical installations must be subjected to will be considered prior to its operation. As for the assembly elements, isolated accessories such as electrical terminals, bushing inserts, busbars, splices, and connectors which are of the utmost importance to succeed in the work will be analyzed. Regarding power transformers, the respective and already regulated standards for underground electrical networks will be taken into account.
The maneuvering and protection equipment will be contemplated as well since this equipment is ideal to protect the installation and avoid major damages that could bring with them a higher cost in terms of detection of the failure and its repair. The final section will be devoted to the assembly and technical descriptions for public lighting.
Ingeniero Eléctrico
Cuenca
2020-10-15T13:43:22Z
2020-10-15T13:43:22Z
2020-10-15
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/34878
spa
TE;473
Atribución-NoComercial-CompartirIgual 4.0 Internacional
http://creativecommons.org/licenses/by-nc-sa/4.0/
openAccess
application/pdf
244 páginas
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/284472018-07-13T16:46:13Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Gestión de proyectos eléctricos integrados con los sistemas de información geográficos
Cuesta Garzón, Lenin Marcelo
Yunga Chapa, Luis David
Ugalde Delgado, Juan Hernando
Avila Campoverde, Ramiro Fernando
Cabrera Cobos, Galo Javier
Designer
Schneider Electric
Factibilidad
Proyectos Electricos
En el presente trabajo se realiza el análisis y evaluación de la gestión de proyectos eléctricos integrados con los sistemas de información geográfica (SIG), específicamente en la etapa de diseños, mediante la aplicación de la herramienta computacional Designer de Schneider Electric, la misma que se encuentra conformada por un gestor de proyectos y un conjunto de herramientas de análisis de ingeniería. Así mismo hace énfasis en los requerimientos que permitan establecer la factibilidad de su implementación en la Empresa Eléctrica Regional CENTROSUR.
El proyecto se basó en un estudio con el cual se pudiese realizar una comparativa entre la metodología de gestión de proyectos actual de la empresa y Designer, para determinar el desempeño de cada una de ellas. En el primer capítulo se indica el planteamiento del problema además se establece el objetivo general y los objetivos específicos, así como la justificación e hipótesis del presente trabajo. El segundo capítulo está relacionado al marco teórico en el que se definen conceptos como la gestión de proyectos y aspectos técnicos como los sistemas de información georeferenciados así como su aplicación en el sector de la distribución eléctrica. En el tercer capítulo se indica las metodologías de gestión de proyectos de las principales empresas de distribución eléctrica del Ecuador, en especial referencia a la Empresa Eléctrica Regional CENTROSUR. Seguidamente, en el cuarto capítulo se revisa la gestión de diseños eléctricos y las herramientas de ingeniería que incorpora Designer. En el capítulo quinto se efectúa la implementación en Designer de un proyecto realizado por la empresa, para luego en el sexto capítulo desarrollar un análisis comparativo de los resultados obtenidos, finalmente en el séptimo capítulo se presentan las conclusiones obtenidas, asimismo se responde al objetivo general y específicos del trabajo de titulación conjuntamente con las recomendaciones por parte de los autores.
The present work performs an analysis and evaluation of the management of the electrical projects integrated with the geographic information systems, specifically in the stage of designs through the application of the computational tool Designer by Schneider Electric, the same one has been made by a Project manager and a set of engineering analysis tools. Likewise, it emphasizes on the requirements that allowed establishing the feasibility of its implementation in the “Empresa Eléctrica Regional Centrosur”.
The project was based on a study case, which allowed a comparison between the company's current project management methodology and Designer, in order to determine the performance of each one of them. The first chapter indicates the approach to the problem and establishes the general objective and the specific objectives, as well as the justification and hypothesis of the present work. The second chapter is related to the theoretical framework that defines concepts such as project management and technical aspects like a georeferenced information systems as well as their application in the electricity distribution sector. The third chapter indicates the methodologies of project management of the main electricity distribution companies in Ecuador, in particular reference to the “Empresa Eléctrica Regional Centrosur”. Then, the fourth chapter reviews the management of electrical designs and the engineering tools that incorporate Designer.
The fifth chapter discusses the implementation of the design of a project that was carried out by the company responsible for the project.
In the sixth chapter discusses of how to develop a comparative analysis of the information obtained.
Finally, in the seventh chapter the final results are reported, as well as the general and theoretical support to the thesis with the author’s recommendations.
Ingeniero Eléctrico
Cuenca
2017-11-06T17:18:53Z
2017-11-06T17:18:53Z
2017
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/28447
spa
TE;404
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/273612020-08-03T17:12:35Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis del impacto de la penetración de generación distribuida en la red de medio voltaje de la Empresa Eléctrica Regional Centro Sur
Loor Cruz, Jefferson Miguel
Narváez Sánchez, Cristian Fernando
Sanango Fernández, Juan Bautista
Generacion Distribuida
Recurso Distribuido
Sistemas Electricos
Interconexion
La generación de energía eléctrica se ha basado en el uso de combustibles fósiles, además que su uso es la principal causa del cambio climático provocado por los seres humanos. Es por ellos indispensables nuevas fuentes para generar energía eléctrica con recursos renovables, para ellos es necesario llevar acabo análisis de los impactos que producen en su conexión a la red de distribución.
Se presenta conceptos de fuentes renovables y generación distribuida, después se da a conocer un tema importante para la interconexión de generación distribuida a la red basado en la norma IEEE 1547 y ARCONEL 004/01. Se da a conocer la clasificación de la generación distribuida de acuerdo a su propósito, localización y capacidad de generación. Se presenta el impacto que tienen las fuentes con recursos renovables de energía en los sistemas eléctricos dependiendo de las características del lugar y de los generadores, además criterios técnicos que hay que observar para poder realizar la interconexión.
Por último, se analizan casos de aplicación en el alimentador #0321 y el alimentador #1523, se determina la capacidad de generación a instalar y el equipo requerido para realizar la interconexión y se efectúa el análisis del comportamiento de las energías renovables operando en la red en diversos escenarios.
Para realizar las simulaciones se emplea el programa DIgSILENT PowerFactory. Este programa se usa para modelar generación, transmisión, distribución y redes industriales.
The generation of electric power has been based on the use of fossil fuels, in addition that its use is the main cause of the climatic change provoked by the human beings. New sources for generating electricity with renewable resources are indispensable for them, it is necessary to carry out analyzes of the impacts they produce in their connection to the distribution network..
It presents concepts of renewable sources and distributed generation, then it is presented an important topic for the interconnection of generation distributed to the network based on the norm IEEE 1547 and ARCONEL 004/01. The classification of distributed generation according to its purpose, location and generating capacity is given. It presents the impact that sources have with renewable energy resources in the electrical systems depending on the characteristics of the place and the generators, in addition technical criteria that must be observed to be able to realize the interconnection.
Case of application are analyzed in the feeder #0321 and the feeder #1523, grid in determining generation capability to install, and devices needed to accomplish the interconnection and making the analysis of renewable energies operatin conncected to the grid upon diferent sceneries.
DIgSILENT PowerFactory is used to perform the simulations. This program is used to model generation, transmission, distribution and industrial networks.
Ingeniero Eléctrico
Cuenca
2017-05-10T13:46:39Z
2017-05-10T13:46:39Z
2017
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/27361
spa
TE;401
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/6852020-08-03T17:08:04Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Determinación de la demanda en transformadores, para los servicios de comercialización en base a los usos de energía, en la Empresa Eléctrica Regional Centrosur para la ciudad de Cuenca
Campoverde Villavicencio, Darwin
Sánchez Delgado, Juan
León Córdova, Pedro
Chérrez Avila, Edgar Manuel
Machado Solís, Santiago
Transformadores Electricos
Energia Electrica
Ingenieria Electrica
El incremento en la población, el avance de la tecnología y las necesidades que requieren ser cubiertas, han incrementado en gran medida el consumo de energía eléctrica, lo que ha llevado a las empresas del sector eléctrico a incrementar su capacidad de generación, extender y robustecer sus redes de transmisión y distribución; con el fin de proporcionar un servicio de buena calidad, confiable y mantener la continuidad del servicio a los usuarios. Una parte importante en el sistema de distribución son los transformadores, cuya capacidad depende de diversos factores tanto técnicos, económicos y sociales. En este trabajo se presentan diversos planteamientos para la determinación de la demanda en un transformador de distribución, considerando métodos comúnmente utilizados y finalmente proponer una metodología para la ciudad de Cuenca que se basa en el consumo mensual de energía y el uso de la misma por parte de los usuarios.
Ingeniero Eléctrico
Cuenca
2013-06-05T14:54:22Z
2013-06-05T14:54:22Z
2012
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/685
spa
TE;317
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64732020-08-03T17:08:51Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Diseño y construcción de un sistema de comunicación digital mediante modulación delta, codificación de canal, modulación FSK y transmisión por rayos infrarrojos
Brito Mancero, Fabián
Peñaherrera Calle, Miguel
Doutreloigne, Jan
Rayos Infrarrojos
Telecomunicaciones
Ingenieria Electrica
Las tres partes esenciales de un sistema de comunicación son: transmisor, canal de transmisión y receptor. En el receptor se ejecutan la amplificación, demodulación, decodificación y filtrado. Se diseña y construye un sistema de comunicación digital utilizando modulación delta, codificación de canal, modulación FSK y transmisión por rayos infrarrojos. Luego de construido el sistema, el mismo funciona correctamente
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:32Z
2014-06-24T21:17:32Z
1993
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6473
spa
TE-143
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64402020-08-03T17:12:21Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Cálculo del alumbrado público asistido por computador
Fernández Avilés, Alba Carmita
Sarmiento P., Manuel
Salgado Rodríguez, Modesto
Alumbrado Electrico
Alumbrado Publico
En esta tesis se realiza un programa computacional que sirve para el diseño de sistemas de alumbrado público. El programa se llama CALUM y mediante el mismo se obtiene iluminación puntual, iluminación media, iluminación mínima, iluminación máxima y el grado de uniformidad para cualquier disposición de luminarias con un máximo de 20 luminarias del mismo tipo. Los temas principales que trata son: Estudio del alumbrado público. Estructuración del modelo. Desarrollo y utilización del programa digital y Manual del usuario
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:27Z
2014-06-24T21:17:27Z
1992
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6440
spa
TE-113
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64442020-08-03T17:07:31Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Determinación de perturbaciones en redes de distribución debido a circuitos rectificadores y otros circuitos que modifican la forma de onda
Durazno Orellana, Hernán
Jaramillo Palacios, Fabián
Energia Electrica
Ingenieria Electrica
En esta tesis se demuestra la incidencia perjudicial de los armónicos en redes de distribución y plantea una solución a este problema. Los armónicos son causados por circuitos rectificadores, conversores, inversores y todos aquellos circuitos que transforman la forma de onda alterna de entrada. Los armónicos son voltajes, corrientes o ambos indeseables y presentes en el sistema de distribución eléctrico que deben ser eliminados, pero llegar a la eliminación total es imposible en la práctica, entonces se recomienda controlarlos
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:27Z
2014-06-24T21:17:27Z
1992
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6444
spa
TE-116
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65492020-08-03T17:09:24Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Grabador de memorias EPROM y EEPROM a través del puerto serial de una P. C.
Zhindón Astudillo, Fabián
Doutreloigne, Jan
Microprocesadores
Microcontroladores
Ingenieria Electrica
El grabador de memorias EPROM y EEPROM, tiene como objetivo principal colocar la información que está almacenada en la PC, en la memoria dicha información queda guardada permanentemente hasta que sea borrada. La comunicación es a través del puerto serial, luego con un interface se logra la comunicación con el microcontrolador y es el que permite grabar la información sobre la memoria. La diferencia entre una memoria EPROM y EEPROM radica básicamente en su borrado, las primeras se las hace con luz ultra violeta, en tanto que en las memorias EEPROM se realiza el borrado electrónicamente. Otra diferencia son los niveles de tensión para la grabación; las memorias EPROM = 12.5V y EEPROM = 5V.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:43Z
2014-06-24T21:17:43Z
1997
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6549
spa
TE-212
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/284902018-07-12T15:54:43Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis del intercambio cooperativo de energía eléctrica adicionando restricciones en microredes eléctricas
León Vizhñay, Andrés Santiago
Lojano León, Andrés Patricio
Sanango Fernández, Juan Bautista
Restricciones
Algoritmo
Microred
Generacion Distribuida
Perdidas De Energia
Los Sistemas de Distribución Eléctricos generalmente son abastecidos por las grandes Subestaciones Eléctricas, que son encargadas de alimentar a los consumidores por medio de las redes de distribución. Ahora con el uso de energías alternativas (eólica, fotovoltaica, etc.) dicho sistema cambió su estructura a la denominada microred. Esta red presenta muchos beneficios para el abastecimiento de la demanda, además de ayudar a fortalecer al sistema eléctrico de potencia y a disminuir las pérdidas de energía eléctrica.
La gran ventaja de una microred es tener su generación en las proximidades de la carga, lo cual conlleva a buscar la mejor oferta de cada empresa generadora o vendedora de energía eléctrica. El algoritmo planteado considera la mejor ubicación de la generación distribuida, para poder abastecer la demanda y reducir las pérdidas de energía.
Este trabajo presenta una alternativa para la optimización de las pérdidas de energía dentro de una microred. Se pretende que bajo el concepto de la Teoría de los Juegos Cooperativos; encontrar un algoritmo que ayude a mejorar el intercambio de energía eléctrica, reducir las pérdidas en dicho intercambio, así como también la reducción de los costos.
La Teoría de los Juegos Cooperativos busca formar el mejor grupo o coalición (vendedor, comprador) que el sistema requiere para abastecer la demanda a un costo reducido. Con esto, el usuario puede considerar a que generación (fotovoltaica, eólica, hidráulica, etc.) comprar la energía y que beneficio (reducción de pérdidas y costos) tenga con dicha coalición.
The Electric Distribution Systems are currently supplied by the large Electrical Substations, which are in charge of feeding the consumers through the distribution networks. Now, with the use of alternative energies (wind, photovoltaic, etc.), this system changed its structure to the so-called Smart Grid. This network has many benefits for supplying demand, as well as helping to strengthen the power system and reduce electrical losses.
The great advantage of a Smart Grid is to have its generation in the vicinity of the load, which leads to find the best offer of each generating or selling company electric power. The algorithm considered the best location of the distributed generation, to be able to supply the demand and reduce the losses of energy.
This investigation presents an alternative for the optimization of energy losses within a smart grid. It is intended that under the concept of Cooperative Games Theory; find an algorithm that helps to improve the exchange of electric energy, reduce losses in such exchange, as well as reduce costs.
The Theory of Cooperative Games seeks to form the best group or coalition (seller, buyer) that the system requires to supply the demand at a reduced cost. With this, the user can consider which generation (photovoltaic, wind, hydro, etc.) to buy the energy and what benefit (reduction of losses and costs) have with that coalition.
Ingeniero Eléctrico
Cuenca
2017-11-15T17:25:28Z
2017-11-15T17:25:28Z
2017
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/28490
spa
TE;407
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/313192020-08-03T17:12:48Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis de factibilidad para la sustitución del uso de energía térmica a energía eléctrica en las camaroneras del cantón Machala
Fajardo Fárez, Roberto Carlos
Quevedo Castillo, Claudio Enrique
Astudillo Salinas, Patricio Alcides
Ingenieria Electrica
Energia Termica
Energia Electrica
Fotovoltaica
Bombas Electricas
Motores Electricos
Sobredimension
El presente trabajo de titulación tiene por objeto elaborar un análisis técnico - económico para el cambio del uso de la energía térmica a energía eléctrica en las camaroneras del cantón Machala. Para cumplir con el objetivo, se analizará una estación de bombeo y se evaluará el costo por uso de diésel y energía eléctrica.
El análisis se basa en la información recopilada sobre el proceso productivo y el consumo de diésel. Los aspectos que deben considerarse son, el sobredimensionamiento en las bombas, consideradas importantes debido al alto consumo de diésel que está relacionado con la capacidad de las máquinas. Otro aspecto es presentar una alternativa energética que reemplace las bombas diésel, por bombas eléctricas que funcionen con energía eléctrica que sean eficientes y que a su vez generen ahorros para contribuir a la disminución del consumo de diésel en el país.
En el sector camaronero, al reemplazar la energía térmica con energía eléctrica, reducirá los costos operativos de manera significativa, por lo tanto, este beneficio se debe utilizar para implementar las nuevas bombas y equipos eléctricos
The purpose of the present titration work is to elaborate a technical - economic analysis for the change of the use of thermal energy to electrical energy in the shrimp farms of the Machala canton. To fulfill the objective, a pumping station will be analyzed and the cost for the use of diesel and electric power will be evaluated.
The analysis is based on the information collected about the production process and diesel consumption. The aspects that must be considered are the oversizing of the pumps, considered important due to the high consumption of diesel that is related to the capacity of the machines. Another aspect is to present an alternative energy that replaces diesel pumps, electric pumps that work with electricity that are efficient and that in turn generate savings to contribute to the reduction of diesel consumption in the country.
In the shrimp sector, when replacing thermal energy with electrical energy, it will reduce operating costs significantly, therefore, this benefit should be used to implement new pumps and electrical equipment.
Ingeniero Eléctrico
Cuenca
2018-10-03T16:19:37Z
2018-10-03T16:19:37Z
2018
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/31319
spa
TE;433
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/303042018-07-13T17:55:11Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Guía de procedimientos del mantenimiento preventivo de alimentadores primarios y generación de indicadores asociados a dichas actividades, en la Empresa Eléctrica Regional Centro Sur C.A.
Pulla Genovez, Andres Dario
Ulloa Gómez, Romel Adrián
Ugalde Delgado, Juan Hernando
Piedra Martínez, Jorge Iván
Avila Campoverde, Ramiro Fernando
Mantenimiento Preventivo
Alimentadores
Indicadores De Calidad
Normas De Seguridad
Empresa Electrica
El levantamiento del proceso del mantenimiento debe estar alineado con la planeación estratégica de CENTROSUR, enmarcado dentro de las políticas, metas y objetivos de la empresa, y debe ser concebido como un proceso de mejora continua, en el cual se tenga una participación activa e integral, de todas las áreas de la empresa.
Por lo anteriormente expuesto, surge una primera necesidad de recopilar y normalizar las mejores prácticas relativas al mantenimiento preventivo de equipos y redes de distribución primaria, teniendo incidencia en los diferentes indicadores de calidad, confiabilidad y medio ambiente, siendo estos elementos claves para una correcta gestión empresarial.
A la par con el levantamiento de las actividades de mantenimiento preventivo se dan a conocer los diferentes métodos de trabajo en instalaciones eléctricas, normas de seguridad, competencias del personal, así como diferentes consideraciones a tener en cuenta para equipos y herramientas de trabajo.
Se identifican las variables asociadas a las actividades de mantenimiento preventivo, así como las principales variables asociadas a los diferentes departamentos de la empresa como son frecuencia y tiempo de desconexión y, a través del desarrollo de un tablero de indicadores se presenta la información de dichas actividades, las cuales servirían para una mejora continua y una oportuna toma de decisiones. Finalmente, se establecen las conclusiones y recomendaciones del tema
The lifting of the maintenance process must be aligned with the strategic planning of CENTROSUR, framed within the policies, goals and objectives of the company, and must be conceived as a process of continuous improvement, in which there is active and integral participation of all areas of the company.
Because of what was previously said, there is a first need to collect and standardize the best practices related to the preventive maintenance of equipment and primary distribution networks, having an impact on the different quality, reliability and environmental indicators, these being key elements for a correct business management.
Along with the lifting of preventive maintenance activities, different methods of work in electrical installations are presented along with safety standards, personnel skills, as well as different considerations to be taken into account for equipment and work tools are disclosed.
The variables associated with the activities of preventive maintenance are identified, as well as the main variables associated with the different departments of the company, such as frequency and time of disconnection and, through the development of a dashboard of indicators the information of said activities is presented, which would serve for continuous improvement and timely decision making. Finally, the conclusions and recommendations of the subject are established
Ingeniero Eléctrico
Cuenca
2018-05-05T00:26:05Z
2018-05-05T00:26:05Z
2018
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/30304
spa
TE;419
application/pdf
application/pdf
application/octet-stream
oai:dspace.ucuenca.edu.ec:123456789/66542020-08-03T17:10:13Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Alternativas de servicio eléctrico para la provincia de Morona Santiago
Cordero D., Efrén
Tacuri C., Arturo
Avilés Guzmán, Marcelo
Provincia De Morona Santiago
Central Hidroelectrica
Energia Electrica
El estudio de la tesis abarca proyección de la demanda y las alternativas de servicio eléctrico para la Provincia de Morona Santiago. El objetivo es el de tratar de reemplazar las pequeñas centrales de generación térmica por pequeños sistemas de generación hidráulica o a su vez el de incorporar al sistema nacional interconectado. De los análisis realizados se obtiene que la mejor alternativa económica para servir a Morona Santiago es la construcción de una línea a 69 kw desde la Subestación # 12 El Descanso-General Leonidas Plaza (Limón).
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:54Z
2014-06-24T21:17:54Z
1985
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6654
spa
TE-40
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/313122020-08-03T17:12:38Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Manual de mantenimiento de puestas a tierra de la línea de subtransmisión 69kV Sacha - Orellana
Fernández Chica, Polo Vinicio
Loayza Romero, Oliver Eddison
Sanango Fernández, Juan Bautista
Estrada Centeno, Jorge Enrique
Ingenieria Electrica
Subtransmision
Puesta De Tierra
Descarga Atmosferica
Mantenimiento
El presente trabajo considera la manera adecuada de realizar el mantenimiento de los sistemas de puesta a tierra en la línea de subtransmisión a 69 kV Sacha – Orellana. El manual de mantenimiento, objeto de este trabajo, detalla los procedimientos, personal, materiales y equipos mínimos necesarios para realizar los mantenimientos preventivos, predictivos y correctivos de los sistemas de puestas a tierra de la línea de subtransmisión.
Los tipos de mantenimientos se encuentran enfocados en función de los registros de descargas atmosféricas, ángulos de apantallamiento de la línea de subtransmisión, resistencia de la puesta a tierra y fallas ocasionadas por causas de origen externo.
Se realiza un análisis desde el punto de vista técnico-económico y socioeconómico, en el cual se buscaron materiales que reemplacen a los que comúnmente se utilizan en los sistemas de puesta a tierra, debido principalmente a los hurtos de los conductores de cobre de los sistemas de puesta a tierra de la línea de subtransmisión Sacha – Orellana, que han ocasionado la mayoría de fallas registradas.
Además se verifica que en la zona oriental del Ecuador, los niveles ceráunicos son elevados en relación al resto del país, lo que da como resultado un mayor número de precipitaciones acompañadas casi en su mayoría de descargas atmosféricas, que influyen directamente en los índices de fallas registradas en la línea de subtransmisión Sacha – Orellana.
This project considers the adequate way to perform maintenance for grounding systems, in the subtransmission line at 69 kV of Sacha- Orellana. The maintenance manual, object of this project, details the procedures, personal, materials, and the minimum equipment required to perform all, preventive, predictive, and corrective maintenances for the grounding systems in the subtransmission line.
The types of maintenance are focused in function of the registers of atmospheric discharges, angles of shielding of the subtransmission line, resistance of the grounding system and the failures due to causes of external origin.
Most of the failures registered are due to the thief of the copper conductors in most of the grounding system of the subtransmission line in Sacha- Orellana. Therefore an analysis from the points of view technical-economic and socio economic provides the search for materials to replace the ones that are commonly used in the grounding system.
Furthermore, there is a verification that in the east zone, the ceraunic levels are elevated in relation to the rest of the country, this provides as a result a higher number of precipitations combined, most of them, with atmospheric discharges that influence directly in the failure indexes registered in the subtransmission line Sacha-Orellana.
Ingeniero Eléctrico
Cuenca
2018-10-03T13:10:47Z
2018-10-03T13:10:47Z
2018
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/31312
spa
TE;431
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65432020-08-03T17:09:25Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Estudio de cortocircuitos del sistema regional Centro Sur
Borrero Vega, Antonio José
Crespo Vintimilla, Pedro José
Neira Moscoso, Jaime Marcelo
Cortocircuitos
Energia Electrica
Se estudia el sistema Regional Centro Sur en condiciones anormales. Para esto se realiza un estudio de cortocircuitos con el fin de realizar un diseño de ampliación del Sistema Regional Centro Sur, lo que implica un aumento de líneas, generadores y un aumento de potencia en las centrales de generación. Este estudio se realiza en 1981 y los resultados se proyectan para el año de 1983 con la implementación de un sistema de 69 Kv.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:42Z
2014-06-24T21:17:42Z
1981
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6543
spa
TE-20
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/325022020-08-03T17:10:49Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Planeamiento de la expansión de los sistemas de transmisión considerando incertidumbre
Sánchez Cueva, Richard Mauricio
Villacrés Enríquez, Luis Ricardo
Torres Contreras, Santiago Patricio
Ingenieria Electrica
Algoritmos
Sistema De Transmision
Probabilidad
Simheuristica
Suministro Electrico
El suministro de energía eléctrica crece rápidamente en la sociedad, por lo que proporcionar energía eléctrica desde su generación hasta su consumo ha tomado un papel fundamental para el desarrollo de la humanidad, convirtiéndolo así en uno de los principales indicadores de desarrollo técnico, social y económico. Por este motivo es importante realizar el Planeamiento de la Expansión del Sistema Eléctrico de Transmisión (PET) que consiste en determinar las modificaciones necesarias en infraestructura que se debe realizar al sistema eléctrico de transmisión para garantizar el correcto funcionamiento del mismo en un horizonte de tiempo. Al considerar la incertidumbre en la demanda y generación, el problema del PET se vuelve aún más complejo de analizar. En este trabajo se presenta la metodología y el modelo matemático para hacer frente al Planeamiento de la Expansión del Sistema de Transmisión considerando incertidumbre. Para la solución del problema se utiliza el modelo AC, y un algoritmo simheurístico que combina la simulación con un algoritmo metaheurístico. Se utilizó la técnica de simulación Montecarlo que permite tratar el comportamiento estocástico de la demanda y generación, y la metaheurística de optimización de la colonia de hormigas para dominios continuos “ACOR” para encontrar la solución óptima del problema. Para analizar el desempeño del algoritmo simheurístico se validó para diferentes escenarios de prueba sobre los sistemas de 6 nodos de Garver y 24 nodos del IEEE.
The supply of electrical energy is growing rapidly in society, so that providing electrical energy from generation to consumption has taken a fundamental role in the development of humanity, making it one of the main indicators of technical, social and economic development. For this reason, It is important realize the Transmission Expansion Planning (TEP), which consists of determining the necessary infrastructure modifications to be made to the electrical transmission system in order to guarantee its correct operation in a time horizon. When considering the uncertainty in demand and generation, the TEP problem becomes even more complex to analyze. This research work presents the methodology and mathematical model to face the Transmission System Expansion Planning considering uncertainty. For the solution of the problem the AC model is used, and a simheuristic algorithm that combines the simulation with a metaheuristic algorithm. The Montecarlo simulation technique was used to treat the stochastic behavior of demand and generation, and the metaheuristic of the Ant Colony Optimization for continuous domains "ACOR" to find the optimal solution of the problem. To analyze the performance of the symheuristic algorithm, it was validated for different test scenarios on Garver 6-bus and IEEE 24-bus systems.
Ingeniero Eléctrico
Cuenca
2019-04-24T12:41:11Z
2019-04-24T12:41:11Z
2019-04-24
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/32502
spa
TE;451
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66182020-08-03T17:09:58Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Efectos y protección de equipos electrónicos ante un impulso electromagnético
Ordoñez Cárdenas, Diego Mauricio
Pesántez Aviles, Juan Carlos
Merchán Manzano, Hernando Efraín
Descarga Atmosferica
Impulso Electromagnetico
Transientes De Sobrevoltaje
Oxido Metalico
El rayo trae consecuencias secundarias como el impulso electromagnético, efecto que debe ser tomado en cuenta el momento de realizar la coordinación de un sistema de protección contra las descargas atmosféricas. La principal consecuencia del impulso electromagnético es el transiente de sobrevoltaje, que es inducido por acoplamiento en los cables que van a los elementos electrónicos. Un transitorio trae consigo una fuerte dosis de energía, que produce muchos estragos en equipos modernos, el daño en equipos electrónicos sensible representan altos costos de mantenimiento y perdida de tiempo. Cuando un equipo electrónico es expuesto a un transitorio, lo primero es el trastorno del equipo y lo segundo es la degradación del equipo. Los dispositivos de protección contra los transientes de sobrevoltaje, están basados en tecnologías similares pero con características diferentes. El varistor de oxido metálico es el elemento que se utiliza en la actualidad por sus ventajas y esta presente en la mayoría de equipos de protección. Debido a sus características es un elemento del que se puede tomar valores característicos en el Laboratorio de Alta Tensión y analizar su comportamiento al estar sometido a un pico de sobrevoltaje.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:51Z
2014-06-24T21:17:51Z
2007
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6618
spa
TE-275
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/258532020-08-03T17:07:37Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Diseño de la ampliación de la subestación Ocaña I, para la integración de la línea de transmisión de la Central Hidroeléctrica Ocaña I – Ocaña II (La Unión) – La Troncal 69 kv, e incorporación AL SCADA
Henry Wilfrido, Calle Tapia
Espinoza González, Juan Ennis
Corral Serrano, Miguel Guillermo
Energia Electrica
Linea De Transmision
Subestacion
Software
Flujo De Potencia
El presente trabajo tiene como objetivo principal diseñar la ampliación de la subestación Ocaña I, para la integración de la línea de transmisión de la central hidroeléctrica Ocaña I – Ocaña II (La Unión) – La Troncal a 69 kV, e incorporación al sistema SCADA junto con la coordinación de protecciones de la línea de transmisión. El estudio tiene lugar en la subestación Ocaña y cuenta con el apoyo de las empresas CENTROSUR y ELECAUSTRO.
El estudio es de tipo exploratorio, descriptivo y proyectivo basado en datos cuantitativos, fórmulas y especificaciones técnicas propias de la ingeniería eléctrica. Se ha requerido el trabajo de campo y levantamiento de datos para realizar los diferentes estudios tales como: Diseño de subestaciones, estudio de flujos de potencia, estudio de cortocircuitos, coordinación de protecciones y simulaciones en general, para ello se ha utilizado los programas AUTOCAD y DigSILENT PowerFactory.
Para el diseño de la aplicación de la subestación, se ha tomado recomendaciones dadas por las normas IEC 60071 - 1 “Insulation Coordination: Definition, Principles and Rules” e IEC 80 – 2000 “IEEE Guide for Safety in AC Substation Grounding”, donde se describe la ingeniería básica correspondiente a coordinación de aislamiento, apantallamiento, malla puesta a tierra, al igual que la selección de pararrayos y de los equipos de protección.
En general, los estudios de flujos de potencia y cortocircuitos permiten determinar los efectos en el área de influencia de la central sobre la red de subtransmisión y determinar las corrientes de cortocircuitos necesarios para la calibración y verificación de los ajustes de ciertas funciones de protección.
En cuanto al sistema SCADA, se da a conocer los principales aspectos a considerar para la integración de las dos nuevas bahías al sistema de automatización y control actual de la central Ocaña. Finalmente se presenta la arquitectura de control y comunicación, donde se pueden apreciar las conexiones de los equipos y los protocolos de comunicación que se emplean.
This research has, as its main objective, to design the expansion of Ocaña I substation to integrate the transmission line of the hydroelectric plant Ocaña I - Ocaña II (La Unión) –La Troncal 69 kV, and incorporate into the SCADA system along with the coordination of protections of the transmission line. The study takes place in Ocaña substation and has the support of ELECAUSTRO and CENTROSUR companies.
This is an exploratory, descriptive and projective study based on quantitative data, formulas, and technical specifications typical of the Electrical Engineering career. To collect the data, fieldwork and a survey along with AUTOCAD and DigSILENT Power Factory programs were used.
To thedesign application of the substation, recommendations given by the IEC 71 – 1 “Insulation Coordination: Definition, Principles and Rules” and IEC 80– 2000 “IEEE Guide for Safety in AC Substation Grounding” standards were applied. The basic engineering corresponding to insulation coordination, screening, and mesh ground, like the selection of arrester and protective equipment are described.
In general, power flow and short circuit studies can determine the effects in thearea of influence of the planton the sub transmission network. Moreover, they determine the short circuit currents required for the calibration and verification of settings of certain protective functions.
Regarding to the SCADA system, the main aspects to be considered for the integration of the new structures to the automation system and current control of the plant Ocaña are made known. Finally, the control and communication architecture are presented in such a way as to see the connections of the equipment, and communication protocols that are used.
Ingeniero Eléctrico
Cuenca
2016-11-09T10:34:26Z
2016-11-09T10:34:26Z
2016
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/25853
spa
TE;394
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65972020-08-03T17:09:50Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Metodologías Alternativas para la Determinación de Pérdidas de Energía en los Sistemas de Distribución de Baja Tensión
Ramírez Cabrera, María Fernanda
Vázquez Granda, Paúl Marcelo
Albornoz Vintimilla, Claudio Esteban
Electricidad
Energia Electrica
Sistemas De Distribucion
Baja Tension
Sistemas Electricos
El presente trabajo pretende realizar un estudio minucioso sobre las pérdidas de energía eléctrica en las redes de baja tensión, ya que estas deben mantenerse en índices adecuados, para lo cual la CENTROSUR. requiere de un estudio actualizado de las mismas para poder identificarlas claramente. Por lo mencionado anteriormente este trabajo proporcionará a la CENTROSUR. un estudio que permita determinar y dar soluciones al problema de las pérdidas de energía eléctrica en las redes de baja tensión, cuyos efectos aquejan a dicha compañía, en donde las pérdidas energéticas se transforman en pérdidas económicas, que de alguna manera afecta a los planes de la empresa.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:48Z
2014-06-24T21:17:48Z
2005
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6597
spa
TE-256
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/285072018-07-13T16:36:25Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Escenarios de contingencias para la automatización de la operación del sistema de distribución para los alimentadores primarios 0321, 0322 y 0722 de la Empresa Eléctrica Regional Centro Sur C.A.
León Tenesaca, Marcelo Esteban
Ugalde Delgado, Juan Hernando
Neira Campoverde, Jaime Patricio
Algoritmo
Reconectadores
Subestaciones
Empresa Electrica
El presente trabajo tiene como objetivo principal obtener los escenarios que surgen en casos de contingencias en el área comprendida por los alimentadores 0321, 0322, 0722, de la Empresa Eléctrica Centro Sur C.A., para lo cual es necesario conocer la topología de la red, realizar un análisis del funcionamiento normal del área piloto, analizar criterios de confiabilidad, criterios de protección, criterios de operación y aplicarlos a la ubicación de los reconectadores, que deben ser implementados en la red. También se realiza el respectivo análisis de la red con criterios para contingencias de n-1 y se analiza las consideraciones necesarias para ejecutar las transferencias de carga entre los distintos alimentadores.
Después, se describen los modelos de automatización principales de los cuales se examina que arquitectura es la más apropiada para efectuar transferencias de carga ante contingencias de forma automática.
Para lograr lo antes expuesto se hace la modelación digital de cada uno de los casos a ser analizados con el software CYMDIST.
Con los resultados se muestra que consideraciones se debe tener en cuenta para realizar la automatización de esta área.
The main objective of this thesis is to obtain the contingency scenarios in the area delimited by the 0321 0322 and 0722 feeders of the Empresa Eléctrica Regional Centro Sur C.A. To achieve this goal is necessary to know the topology of the electric network, perform an analysis of the operation of the network, of the reliability and the protection, and apply them to find the location of the reclosers in the network. Also, it is necessary to study the criteria of N-1 and it is necessary to know the restrictions to execute load transfers between feeders.
Later, in this document is described the most important architecture of models of automation, to determinate which is the model that fits the requirements of load transfers. CYMDIST was used to make all the analysis of the present work.
Finally, the results show which considerations we have to considerate to automatize this area.
Ingeniero Eléctrico
Cuenca
2017-11-17T12:19:12Z
2017-11-17T12:19:12Z
2017
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/28507
spa
TE;409
application/pdf
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/325662020-08-03T17:11:15Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis de calidad de energía eléctrica en la Facultad de Ingeniería de la Universidad de Cuenca
Gómez Orellana, Jaime Marcelo
Astudillo Salinas, Patricio Alcides
Calidad
Sistema Electrico
Tableros De Distribucion
La calidad de energía eléctrica es un tema de importancia para el desarrollo de la economía, la industria, donde se requiere contar con un servicio eléctrico que no genere daño en equipos sensibles que no toleran fluctuaciones.
El objetivo de este trabajo de titulación es realizar un análisis de calidad del sistema eléctrico de la Facultad de Ingeniería, con la finalidad de recabar información de los niveles de voltaje, corriente, frecuencia, desequilibrio de voltaje, armónicos, fliker, factor de potencia, potencia activa, reactiva, aparente, energía y con ello proceder a diagnosticas el estado actual de la energía eléctrica.
Con el pasar de los años la demanda eléctrica en la Facultad se ha incrementado de acuerdo con la implementación de nuevos equipos en beneficio de los estudiantes. Dando como resultado instalaciones eléctricas nuevas, al no existir un plano actualizado de los circuitos de iluminación, fuerza y la ubicación de los tableros de distribución, se realiza el levantamiento de las cargas fijas que se encuentran instaladas y se presenta un plano de mejora que involucra cambio y reubicación de tableros.
The quality of electric power is an issue of importance for the development of the economy, the industry, where it is necessary to have an electrical service that does not generate damage in sensitive equipment that does not tolerate fluctuations.
The objective of this certification work is to perform a quality analysis of the electrical system of the Faculty of Engineering, in order to collect information on the voltage levels, current, frequency, voltage imbalance, harmonics, fliker, power factor, active power, reactive, apparent, energy and with that proceed to diagnose the current state of electric power.
Over the years, the electric demand in the Faculty has increased according to the implementation of new equipment for the benefit of the students. Obtaining as result new electrical installations, since there is no updated plan of lighting, circuits force and the location of the distribution boards, is done the lifting of the fixed charges that are find installed and a plane of improvement that involves change is presented and relocation of boards.
Ingeniero Eléctrico
Cuenca
2019-04-30T15:14:03Z
2019-04-30T15:14:03Z
2019-04-30
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/32566
spa
TE;454
application/pdf
application/pdf
application/pdf
application/pdf
application/pdf
application/pdf
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/67002020-08-03T17:10:30Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Simulación del motor de inducción Jaula de Ardilla incluyendo el efecto piel
Cusco G., Antonio C.
Sánchez T., Víctor M.
León Galarza, Raúl
Maquinas De Induccion
Motor Jaula De Ardilla
Se realiza un programa computacional para la simulación digital de la máquina de inducción trifásica Jaula de Ardilla, mediante tres modelos: Modelo convencional, modelo de dos secciones y modelo de tres secciones. Para cada uno de los modelos se obtiene el funcionamiento en régimen transitorio para cuatro operaciones específicas que son: Aceleración libre, variación del torque mecánico, alimentación con voltajes desbalanceados y apertura de la fase a. Se obtienen respuestas similares para los modelos de dos y tres secciones, los mismos que tienen gran diferencia con la respuesta del modelo convencional
Ingeniero Eléctrico
Cuenca
2014-06-24T21:18:02Z
2014-06-24T21:18:02Z
1990
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6700
spa
TE-84
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/215322020-08-03T17:11:20Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Incidencia del programa 'cocción eficiente' en la demanda máxima unitaria para la provincia de Morona Santiago
Alvarez Quito, Leonardo Xavier
Apolo Apolo, Cristhian Agustín
León Córdova, Pedro
Sarmiento Reinoso, Pablo Fabián
Coccion Eficiente
Cocina De Induccion
Provincia De Morona Santiago
El presente trabajobusca determinar el impacto de la incorporación de cocinas de inducción de acuerdo al plan de cocción eficiente (PCE), en la demanda máxima unitaria (DMU) y demanda diversificada (DD) para los clientes residenciales urbanos y rurales servidos por la CENTROSUR en la provincia de Morona Santiago.
El estudio se basa en la recolección de información a través de encuestas, cuyo objetivo es determinar en forma detallada el uso de la cocina, tomando en cuentael comportamientoy costumbres de los clientes a la hora de la cocción de alimentos. A partir de esta información se procede a realizar un análisis de las curvas de hábito de uso horario de la cocina para determinarlas características más importantes y las horas con mayor incidencia.
Finalmente se propone una metodología para el cálculo de los factores de coincidencia, el cual se inicia mediante un proceso estocástico que genera un mayor número de datos, permitiendo así graficar una curva de factores de coincidencia para cada estrato de consumo (kWh) y así determinar la DMU y DD para cada uno de ellos.
The present report searches to determine the impact of the incorporation of induction stoves, according to the Plan for Efficient Cooking (PEC), on the unitary maximum demand (UMD) and the diversified demand (DD) for urban and rural residents that are served by the CENTROSUR in the province of Morona-Santiago.
This study is based on data collected through surveys, with the objective of determining in detail how stoves are used, taking into account the behavior and customs of clients when cooking food. Based on this information, a habit curves analysis was made of the schedule use of the kitchen to determine the most important characteristics and the hours of increased incidence.
Finally, a methodology is proposed to calculate the factors of coincidence, which is started by a stochastic process, generating a greater number of data, allowing to graph a curve for each stratum of coincidence factors of consumption (kWh) and thus determining the UMD and DD for each of them.
Ingeniero Eléctrico
Cuenca
2015-03-24T17:58:56Z
2015-03-24T17:58:56Z
2015
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/21532
spa
TE;378
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65312020-08-03T17:09:20Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Proyecto para la subestación de Azogues
Cárdenas, José
Pesántez, Ramón
Viteri Salazar, Hugo
Subestaciones Electricas
Energia Electrica
Canton Azogues
Ingenieria Electrica
Se estudia y diseña un subestación localizada en la ciudad de Azogues, que es de tipo principal con barras a 138/22/69 Kv, con una capacidad en su etapa inicial de 10/12.SMVA (para 69-22 Kv) y en su etapa final de 2 X 10/12.SMVA. Se realiza un estudio de la resistividad en los terrenos de la subestación, de los sistemas de puesta a tierra y de las especificaciones técnicas del equipo a utilizarse en la subestación. Finalmente se realiza el diseño de la subestación, incluyendo los planos necesarios para la construcción del proyecto
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:41Z
2014-06-24T21:17:41Z
1981
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6531
spa
TE-19
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/337472020-08-03T17:12:05Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Evaluación de la calidad de energía eléctrica del laboratorio de automatización de la facultad de Informática y Electrónica - ESPOCH
Guerra Chávez, Joseph David
González Morales, Luis Gerardo
Ingeniería Eléctrica
Energía eléctrica
Frecuencia
Potencia
Onda
Se evalúo la calidad de energía eléctrica del laboratorio de automatización de la Facultad de Informática y Electrónica de la ESPOCH, ubicado en la ciudad de Riobamba. El análisis considera la variación de la frecuencia, amplitud, forma de onda y simetría según las normativas de la ARCONEL 005/18 y 004/18, EN50160, IEC 61000-4-15 y IEEE 519-2014. El estudio se justifica debido a continuos incidentes en el equipamiento de alto costo disponible en el laboratorio.
Del análisis realizado en el tablero principal, con el equipo Fluke 435 aplicando una tasa de muestreo de 10min durante 7 días según normativa del ARCONEL. Se destaco el flicker de Plt, en las fases C con 7,24% y en B con 6,05%. Se obtuvo un promedio de la distorsión armónica de corriente total en las fases A, B, C y neutro de 44,61%, 65,24%, 55,27% y 231,94% respectivamente. Los armónicos de orden 3, 5, 7, 9 y 11 con mayor distorsión de corriente individual se presentan en la fase B con 46,22%, 34,52%, 22,15%, 15,26% y 9,14%, respectivamente. El factor de potencia total calculado fue 0,83p.u. y el mínimo 0,79p.u. en la fase B, valores que incumplen la normativa.
Como solución se propone instalar un filtro activo en paralelo de 30A, del tipo AFQm-4WF-030M-400 de CIRCUTOR o el SINAFM440030W de LIFASA, verificar las conexiones eléctricas y evitar posibles modificaciones o expansiones de las mismas sin un estudio previo. Esto garantizará la calidad de energía eléctrica del edificio y el buen funcionamiento de los equipos existente.
The electrical power quality of the automation laboratory of the Faculty of Informatics and Electronics of ESPOCH, located in the city of Riobamba, was evaluated. The analysis considers the variation of frequency, amplitude, waveform and symmetry according to the standards of ARCONEL 005/18 and 004/18, EN50160, IEC 61000-4-15 and IEEE 519-2014. The study is justified due to continuous incidents in the high-cost equipment available in the laboratory.
From the analysis carried out on the main board, with the Fluke 435 equipment applying a sampling rate of 10min during 7 days according to ARCONEL regulations. The flicker of Plt was highlighted, in phases C with 7.24% and in B with 6.05%. The average harmonic distortion of total current in phases A, B, C and neutral was 44.61%, 65.24%, 55.27% and 231.94% respectively. The harmonics of order 3, 5, 7, 9 and 11 with the highest individual current distortion are presented in phase B with 46.22%, 34.52%, 22.15%, 15.26% and 9.14%, respectively. The total power factor calculated was 0.83p.u. and the minimum 0.79p.u. in phase B, values that do not comply with regulations.
As a solution it is proposed to install an active filter in parallel of 30A, of the type AFQm-4WF-030M-400 of CIRCUTOR or the SINAFM440030W of LIFASA, to verify the electrical connections and to avoid possible modifications or expansions of the same ones without a previous study. This will guarantee the electrical power quality of the building and the proper functioning of the existing equipment.
Ingeniero Eléctrico
Cuenca
2019-12-17T18:01:26Z
2019-12-17T18:01:26Z
2019-12-17
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/33747
spa
TE;467
application/pdf
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/64452020-08-03T17:07:31Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Errores en los aparatos de medición por la utilización de señales no sinusoidales
Guzhñay Villa, Mauro
Jaramillo Palacios, Fabián
Instrumentos Electricos
Ingenieria Electrica
En el presente trabajo se determinan los errores producidos en los instrumentos de medición, cuando estos son usados en la medición de señales no sinusoidales producidas por sistemas controlados, no controlados, rectificador de media onda con filtro de capacitor y control de ciclo integral. Los instrumentos a analizar serán los de bobina móvil, hierro móvil, electrodinámicos y digitales
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:27Z
2014-06-24T21:17:27Z
1992
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6445
spa
TE-117
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64902020-08-03T17:08:57Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Diseño y construcción de un modulo de sincronización para un sistema de comunicación digital basado en sistema de modulación de impulsos codificados (PCM) y multiplex por división de tiempo (TDM)
Padilla, Nelson
Doutreloigne, Jan
Energia Electrica
Modulo Sincronizado
Comunicacion Digital
Modulacion De Impulsos
Este estudio de comunicacions se restrigirá a la tranmisión de información a través de distancias cortas por medio de un cable coaxial. El empleo de señales eléctricas ha reemplazado casi completamente a todas las otras formas de transmisión de información a grandes distancias.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:34Z
2014-06-24T21:17:34Z
1995
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6490
spa
TE-158
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64592020-08-03T17:08:46Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Optimización técnico económico de alimentadores primarios de la E.E.R.C.S.
Jiménez Landívar, Marcelo
Vintimilla Córdova, Fulvio
Durán Noritz, Carlos
Energia Electrica
Ingenieria Electrica
Se plantea una metodología cuyo propósito fundamental es el de reducir las pérdidas de energía, evaluar sus costos y los costos de las inversiones para obtener estas reducciones a lo largo del alimentador, considerando las restricciones de caída de tensión y capacidad de conducción. Los temas que enfoca son: Métodos de optimización , optimización en sistemas de distribución, análisis de caídas de tensión y pérdidas de potencia y energía en sistemas de potencia y energía en sistemas de distribución, optimización del conductor, ubicación y dimensionamiento óptimos de bancos de capacitores y aplicación práctica en un alimentador de la EERCS.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:30Z
2014-06-24T21:17:30Z
1993
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6459
spa
TE-130
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/315002020-08-03T17:13:04Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Diseño de un sistema de control para la automatización de la planta de agua potable de San Cristóbal-Paute
Villa Avila, Edisson Andrés
Ortega Ortega, Martín Eduardo
Ingenieria Electrica
Compensacion
Sensor
Señal Analogica
Señal Digital
Control Automatizado
En el siguiente trabajo se presenta el “Diseño de un sistema de control para la automatización de la planta de agua potable de San Cristóbal-Paute”, en el cual se incluye los diseños de control y fuerza para los procesos de potabilización del agua y los diseños de control supervisor de los subprocesos inherentes al proceso de Potabilización del Agua de la Planta de Tratamiento de Agua de San Cristóbal, utilizando apropiadamente el tema de la automatización de una manera estructurada y ordenada. Para su elaboración se establece una visión funcional del proceso de potabilización por medio de diagramas de control y fuerza que sirven como base para establecer las etapas a ser automatizadas de la Planta de Tratamiento de Agua de San Cristóbal y otras similares por ejemplo Cachiyacu, Tomebamba, Bante, entre otras, específicamente en el procedimiento de insumos químicos, filtros y bombeo, lo cual se considera la contribución principal de este trabajo.
El diseño y los equipos propuestos para la automatización de la planta de tratamiento de agua potable, tienen la finalidad de garantizar la vida útil de los equipos de bombeo, la continuidad, eficiencia y seguridad en la operación de los equipos instalados, manteniendo de forma permanente el respectivo tratamiento del agua y así poder suministrar de agua potable al tanque de Distribución de Chala mediante el desarrollo de un sistema de control.
The following paper presents the "“Diseño de un sistema de control para la automatización de la planta de agua potable de San Cristóbal-Paute”, which includes the design of control and force for water purification processes and water Supervisory control designs of the subprocesses inherent to the Water Purification process of the San Cristóbal Water Treatment Plant, appropriately using the automation theme in a structured and orderly manner. For the elaboration of this work, a functional vision of the potabilization process is established by means of control and force diagrams that served as the basis to establish the stages to be automated. In addition to serving as a basis for the automation of the Water Treatment Plant of San Cristóbal and other similar for example Cachiyacu, Tomebamba, Bante, among others, specifically in the process of chemical inputs, filters and pumping, which is considered the main contribution of this work.
The design and equipment proposed for the automation of the drinking water treatment plant, have the purpose of guaranteeing the useful life of the pumping equipment, the continuity, efficiency and safety in the operation of the installed equipment, maintaining permanently the respective treatment of the water and thus be able to supply drinking water to the Chala Distribution tank through the development of a control system.
Ingeniero Eléctrico
Cuenca
2018-10-29T12:18:49Z
2018-10-29T12:18:49Z
2018
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/31500
spa
TE;445
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64542020-08-03T17:08:46Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis teórico-práctico de los procesos transitorios en las máquinas sincronas y de inducción
Chacón Zh., Patricio
Abril G., Galo
Chérrez Tamayo, Antonio
Maquinas Electricas
Maquinas Sincronicas
Maquinas De Induccion
Ingenieria Electrica
El objetivo de esta tesis es la modelación de las máquinas sincronas y de inducción en la presencia de fenómenos transitorios. El modelo matemático se consigue utilizando la transformación del sistema de ecuaciones a un sistema de referencia rotatorio, a una velocidad arbitraria. El modelo se aplica a un computador digital y los resultados se comparan con las pruebas experimentales
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:29Z
2014-06-24T21:17:29Z
1979
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6454
spa
TE-12
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/372372021-11-08T08:01:24Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis en estado estacionario y verificación del sistema de protecciones en las líneas de transmisión de las subestaciones adyacentes ante la incorporación del Parque Eólico Minas de Huascachaca al Sistema Nacional de Transmisión
Merchán Muñoz, Christian Israel
Vintimilla Zhingre, Pablo Andrés
Astudillo Salinas, Patricio Alcides
Ingeniería Eléctrica
Energía eólica
Central eléctrica
Energía eléctrica
En este trabajo de titulación se realiza un análisis del impacto
eléctrico ante la incorporación del parque eólico Minas de Huascachaca (PEMH)
en el Sistema Nacional de Transmisión (SNT) de 138 kV.
Se inicia con una breve descripción de los elementos del Sistema Eléctrico de
Potencia (SEP) y sus métodos de análisis en estado estacionario equilibrado y
desequilibrado. Se prosigue con la descripción técnica de los aerogeneradores
y equipos asociados; luego, se realiza un estudio estadístico de la velocidad del
viento en el emplazamiento del PEMH, con el objetivo de determinar las
velocidades medias y así poder estimar la potencia de salida de los
aerogeneradores al momento de la producción de energía eléctrica; la potencia
de generación estimada y los datos técnicos del PEMH permiten realizar el
análisis en estado estacionario del SEP asociado al PEMH antes y después de
la incorporación del mismo para demanda mínima, media y máxima en los
periodos secos y lluviosos; para luego realizar el análisis de contingencias N – 1
después de la incorporación PEMH.
El trabajo continúa con un estudio de cortocircuitos de las barras asociadas al
PEMH; así como la verificación del sistema de protecciones de las líneas
adyacentes a la subestación La Paz. Finalizando con las conclusiones y
recomendaciones. Todos los cálculos y simulaciones se realizaron a través del
software DIgSILENT PowerFactory.
In this degree work, an analysis of the electrical impact of the
incorporation of the Minas de Huascachaca Wind Farm (MHWF) in the 138 kV
National Transmission System (NTS) is carried out.
The work begins with a brief description of the elements of the Electrical Power
System (EPS) and its balanced and unbalanced steady state analysis methods.
It continues with the technical description of the wind turbines and associated
equipment; then, a statistical study of the wind speed at the MHWF site is carried
out, with the objective of determining the average speeds and thus being able to
estimate the output power of the wind turbines at the time of electric energy
production; The estimated generation power and the technical data of the MHWF
allow performing the steady state analysis of the EPS associated to the MHWF
before and after the incorporation of the MHWF for minimum, average and
maximum demand in dry and rainy periods; to then perform the analysis of
contingencies N – 1 after the incorporation of the MHWF.
The work continues with a study of short circuits of the bars associated to the
MHWF; as well as the verification of the protection system of the lines adjacent
to the La Paz substation. It ends with conclusions and recommendations. All
calculations and simulations were performed using DIgSILENT PowerFactory
software.
Ingeniero Eléctrico
Cuenca
2021-11-04T16:35:55Z
2021-11-04T16:35:55Z
2021-11-04
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/37237
spa
TE;488
Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Attribution-NonCommercial-NoDerivatives 4.0 Internacional
http://creativecommons.org/licenses/by-nc-nd/4.0/
openAccess
application/pdf
application/pdf
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/65932020-08-03T17:12:31Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis técnico económico del anillo metropolitano de fibra optica para Cuenca
Chango Aguinzaca, Jorge Eduardo
Jaramillo Palacios, Fabián
Telecomunicaciones
Anillo Metropolitano
Fibra Optica
Canton Cuenca
Ingenieria Electrica
El objetivo fundamental de esta tesis es determinar la ruta ténica económica, que preste las mejores condiciones de factibilidad y servicio, el estudio a realizarse se basará en definir una ruta entre dos alternativas. En el capítulo 2 presenta información de la población y servicios existentes; en el capítulo 3 se realiza el análisis de las alternativas técnicas; en el capítulo 4 se realiza el análisis económico de las mismas, para presentar el diseño final en le capítulo 5, y en el capítulo 6 se realizan las conclusiones y recomendaciones; se anexan planos A0 de las rutas mencionadas.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:48Z
2014-06-24T21:17:48Z
2004
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6593
spa
TE-252
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66822020-08-03T17:10:28Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Sistemas de acometidas y mediciones de energía Eléctrica
Reyes Bermeo, Jorge
Cabrera Regalado, Eugenio
Bermeo Pesántez, Jaime Alfredo
Acometidas Electricas
Energia Electrica
Ingenieria Electrica
Se establece un procedimiento general para la realización de acometidas y la medición de energía eléctrica incluyendo las normas de seguridad necesarias para realizar un proyecto y construcción de acometidas en alta y baja tensión y las cámaras de transformación. Se realiza una descripción teórica de los sistemas de acometidas en alta y baja tensión, fusibles, contadores de energía, cámaras de transformación etc., y se presentan las recomendaciones al final de la exposición de cada tema.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:58Z
2014-06-24T21:17:58Z
1988
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6682
spa
TE-68
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/344562020-06-08T20:48:27Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis de Factibilidad de la reconfiguración del sistema de subtransmisión de la E.E.R.C.S. C.A. por la Inserción de nuevas subestaciones y cambio de nivel de voltaje
Alvarado Morocho, Bayron Andrés
Andrade Palacios, Eduardo Sebastián
Sanango Fernández, Juan Bautista
Ingeniería Eléctrica
Optimización
Subtransmisión
Conmutación
Líneas de subtransmisión
El presente trabajo se centra en la optimización del sistema de subtransmisión de la E.E.R.C.S. C.A. a través de la conmutación óptima de líneas para disminuir pérdidas, mejorar perfiles de voltaje y reducir las corrientes de cortocircuito; esto mediante la implementación de una rutina de programación elaborada en lenguaje Python que utiliza el programa Digsilent Power Factory (programa especializado de análisis de red), esta rutina realiza una búsqueda exhaustiva y determina la configuración óptima del sistema; el parámetro será la conmutación de 1 a 5 líneas a la vez. Como primera parte se realiza el análisis de la situación actual del sistema de subtransmisión de la E.E.R.C.S. C.A., determinando los parámetros que se tienen que mejorar; para esto se utiliza la herramienta MATPOWER (programa de análisis matemático), que es un paquete gratuito de MATLAB; por último, se realiza una comparación entre los dos programas utilizados. La segunda parte del estudio analiza como es el comportamiento del sistema con la inserción de una subestación de generación utilizando MATPOWER y la inserción de una subestación de reducción para distribución utilizando Digsilent Power Factory. Como tercera parte se realiza la optimización del sistema en el estado actual y se plantea una configuración con la inserción de una subestación de reducción para distribución, utilizando la rutina de búsqueda exhaustiva para conmutación óptima de líneas. Para finalizar se presenta un análisis del cambio de nivel de voltaje de 69kV a 138kV en una línea específica, la cual presenta parámetros a mejorar, con esto se pretende verificar la factibilidad de este cambio, determinando la configuración para que el sistema trabaje en óptimas condiciones.
The present work focuses on the optimization of subtransmision system the E.E.R.C.S. C.A., through line optimal switching to improve losses, voltage profiles and reduce short-circuit currents; this by implementing a programming routine developed in Phyton language that uses Digsilent Power Factory software (specialized software for network analysis), this routine performs an exhaustive search and determines the optimal configuration of the system; the parameter will be switching from 1 to 5 lines at a time. As a first part, is done the analysis of the current subtransmision system the E.E.R.C.S. C.A., determining the parameters that have to be improved; for this, the MATPOWER tool (mathematical analysis software) is used, which is a free the MATLAB package; finally, a comparison is made between the two software’s used. The second part of the study analyzes how the system behaves with the insertion of a generation substation using MATPOWER and the insertion of a reduction substation for distribution using Digsilent Power Factory. As a third part, the optimization of the system in the current state is carried out and a configuration is proposed with the insertion of a reduction substation for distribution, using the exhaustive search routine for optimal line commutation. Finally, an analysis of the change the voltage level from 69 kV to 138 kV in a specific line is presented, which presents parameters to improve, whit this intended to verify the feasibility of this change, determining the configuration so that the system works in optimal conditions.
Ingeniero Eléctrico
Cuenca
2020-06-08T20:48:24Z
2020-06-08T20:48:24Z
2020-06-08
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/34456
spa
TE;469
application/pdf
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/66432020-08-03T17:10:10Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Políticas para ahorro de consumo de energía eléctrica en el área residencial del casco urbano de la ciudad de Cuenca.
Bonete Valladares, Juan Carlos
Becerra Palacios, Edgar Rolando
Cabrera Albornoz, Fabián
Ingenieria Electrica
Energia Electrica
El presente trabajo de tesis de graduación trata sobre las Políticas para el Ahorro de Consumo de Energía Eléctrica en el Área Residencial del Casco Urbano de la Ciudad de Cuenca, mismo que permite tener una idea clara de lo que ocurre actualmente con el consumo de este bien en cada una de las viviendas. El proceso de desarrollo del presente estudio está basado en la recopilación de información a una muestra escogida de la ciudad de Cuenca, estos datos han sido tabulados para su mejor entendimiento, lo cual presenta un porcentaje de consumo de cada uno de los ambientes de las viviendas, también los equipos de alto consumo como refrigeradores, que tiene un tratamiento independiente, iluminación, cuarto de estudio, cuarto de cocina, dormitorio, área de aseo y limpieza, equipos de audio/video y computación. Finalmente se tiene como resultado: Visualización del consumo promedio actual de los diferentes artefactos eléctricos usados en las viviendas. Presentación de un consumo ideal de diferentes artefactos para un correcto uso de la energía eléctrica. Presentación de uso eficiente de la energía, con las alternativas que permiten ahorro de un 20 hasta un 50%. Recomendaciones y alternativas para la construcción de viviendas.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:53Z
2014-06-24T21:17:53Z
2009
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6643
spa
TE-297
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64602020-08-03T17:08:48Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Reconfiguración de alimentadores primarios de la E.E.R.C.S.
Albornoz Vintimilla, Esteban
Avila Lasso, Paúl
Ortega Delgado, Iván
Energia Electrica
El objetivo de esta tesis es la reconfiguración de alimentadores primarios de la EERCS. Este análisis permite al ingeniero disponer de datos y resultados que a la vez de facilitar, le orienten en la toma de decisiones más adecuadas en la planeación y operación del sistema. Enfoca los siguientes temas: Sistema de red primaria; generalidades sobre reconfiguración de alimentadores: estrategias de reconfiguración de alimentadores; reconfiguración de alimentadores para reducción de pérdidas; técnicas de inteligencia artificial aplicadas a la reconfiguración de alimentadores; algoritmo para restablecer el servicio en sistemas de distribución utilizando el método de búsqueda heurística; descripción del programa computacional.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:30Z
2014-06-24T21:17:30Z
1993
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6460
spa
TE-131
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64762020-08-03T17:08:51Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Elementos estáticos en sistemas de control
Machuca Rendón, Gina
Chérrez Tamayo, Antonio
Electronica
Sistemas De Control
Ingenieria Electrica
Se revisan conceptos básicos de electrónica y sus elementos como son diodos, diodo zener, triacs, diacs y tiristores. Luego se presentan los circuitos para el control de motores, con los valores de los elementos necesarios como son resistencias, condensadores, etc.
Ingeniera Eléctrica
Cuenca
2014-06-24T21:17:32Z
2014-06-24T21:17:32Z
1980
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6476
spa
TE-14
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64352020-08-03T17:07:25Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis de los conversores DC-DC y determinación de los parámetros mediante programas computacionales
García Lasso, Javier
Ronquillo Castañeda, Marco
Jaramillo Palacios, Fabián
Control Electronico
Hardware
Ingenieria Electrica
Los conversores DC-DC son circuitos que convierten una corriente continua de tensión y corriente determinada en otra corriente continua de diferentes características de tensión y corriente. Los objetivos de la presente tesis son: Exponer la teoría relacionada con los conversores DC-DC; y realizar un programa computacional para el análisis y diseño de los conversores DC-DC. Los temas que enfoca la tesis son: Introducción teórica de los conversores y los interruptores estáticos más usados. Técnicas de conmutación del tiristor. Análisis de los circuitos conversores DC-DC. Programas computacionales para el análisis y diseño de los conversores DC-DC
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:26Z
2014-06-24T21:17:26Z
1991
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6435
spa
TE-108
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/6912020-08-03T17:07:44Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Diseño de una metodología para la reducción y control de pérdidas de energía utilizando índices sectorizados de pérdidas en alimentadores primarios para CNEL S.A. regional El Oro
Castillo Abad, Edwin Rolando
Pérez Ayala, Angel Fernando
Ugalde Delgado, Juan Hernando
Balance Energetico
Indices Sectorizados
Metodologia
Control De Perdidas
El presente trabajo tiene como finalidad establecer una metodología para la reducción y control de pérdidas no técnicas de energía por alimentador primario, realizando la sectorización del mismo, la que comprende una etapa de macro medición y otra de micro medición. En el desarrollo de la metodología, es necesario desagregar las pérdidas técnicas y no técnicas del total de pérdidas de energía. El cálculo de pérdidas técnicaspor alimentador primario se lo realiza para cada componente de red, es decir en redes de media tensión, transformadores de distribución, redes de baja tensión, luminarias, acometidas y medidores de energía para lo cual se utiliza equipos de medición, software de simulación, bases de datos además de hojas de cálculo electrónicas. Una vez calculadas las pérdidas técnicas, se obtienen las pérdidas no técnicas de energía, mediante la cual se establecen índicessectorizados de pérdidas no técnicas. Estos indicadores son los que permiten dirigir las acciones de reducción y control planteadas en la presente metodología. La sectorización y el cálculo de los índices sectorizados de pérdidas no técnicas planteados en la metodología, se realizaron para el alimentador 0411 Madero Vargas, de la subestación Machala, perteneciente a CNEL S.A. Regional El Oro.
Ingeniero Eléctrico
Cuenca
2013-06-05T14:54:23Z
2013-06-05T14:54:23Z
2012
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/691
spa
TE;323
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65922020-08-03T17:09:42Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Dimensionamiento de redes secundarias radiales, incluida estación de transformación
Lazo Pintado, Francisco Marcelo
Salgado Rodríguez, Modesto
Energia Electrica
Redes Electricas
Transformadores
Distribucion Electrica
El presente estudio está dirigido al análisis de los diferentes criterios empleados para el dimensionamiento de las redes secundarias radiales; así como se ha realizado un análisis de la cargabilidad en transformadores de distribución (MT/RT). En el estudio se presenta un análisis técnico económico en redes secundarias y transformadores, para la cual se ha desrrollado un Softwares de aplicación que se incluye para el análisis de la incidencia de las pérdidas energéticas en transformadores y redes secundarias, criterio que debe ser considerado para el dimensionamiento de los elementos anterionrmente citados, con el fin de evitar sobreinversiones económicas en las empresas de distribución.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:48Z
2014-06-24T21:17:48Z
2004
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6592
spa
TE-251
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/67112020-08-03T17:10:38Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Estudio digital de cortocircuitos
Serpa Rodas, Max F.
Torres Sarmiento, Tito Q.
Borrero Vega, Antonio José
Redes Electricas
Lineas Electricas
Ingenieria Electrica
Se realiza un programa que permite modelar todos los componentes de redes, simular el acoplamiento magnético entre líneas de transmisión, calcular los siguientes tipos de fallas trifásica, bifásica, bifásica a tierra, monofásica a tierra, efectuar estudios de cortocircuitos con líneas fuera y falla en terminal abierto de línea, realiza el cálculo de corrientes y tensiones en cualquier punto de la red frente a condiciones de falla.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:18:04Z
2014-06-24T21:18:04Z
1990
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6711
spa
TE-95
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64572020-08-03T17:08:47Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Revisión y construcción del control de velocidad de un motor de inducción basado en el sistema recuperador de energía de deslizamiento
Torres P., Fabián
Torres P., Luis
Jaramillo Palacios, Fabián
Maquinas Electricas
Ingenieria Electrica
En la TE(111), se realizó el diseño del control de velocidad del motor de inducción de rotor devanado mediante recuperación de energía de deslizamiento. En esta tesis se construye este sistema de control de velocidad y se demuestra que con el mismo se puede fijar la velocidad de trabajo más finamente y permanecer en ella casi invariablemente, no ocurriendo así con el control de velocidad usando resistencias externas conectadas a los bornes del rotor, además se realiza revisiones y modificaciones del control de velocidad, construcción de los sistemas de fuerza y de control, pruebas y resultados
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:29Z
2014-06-24T21:17:29Z
1993
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6457
spa
TE-128
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/55312020-08-03T17:07:21Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis y metodología de evaluación de la polución lumínica causado por el alumbrado público en la ciudad de Cuenca
Guanuquiza León, Marco Vinicio
Quito Arias, Raúl Martín
Espinoza Abad, Juan Leonardo
Pulla Galindo, Giovani Santiago
Polucion Luminica
Alumbrado Publico
Evaluacion Electrica
Contaminacion Luminica
Empresa Electrica
Canton Cuenca
Ecuador
El principal objetivo de esta tesis es presentar una metodología orientada al análisis de la polución lumínica provocada por el alumbrado público en la ciudad de Cuenca. Para lograr este objetivo, se hizo el levantamiento de información mediante el medidor de la calidad del cielo (SQM-LU-DL), cuyos resultados deberán ser interpretados cuidadosamente, ya que, durante el presente trabajo, fueron tomados en tiempos y condiciones climáticas diferentes.
Con la información levantada, se recomendó una escala para representar la polución lumínica en ciudades. Con ello, es posible generar mapas de contaminación lumínica en una determinada ciudad. Sin embargo, dicha escala deberá ser analizada y revisada en próximos proyectos. La nubosidad, temperatura, y humedad, son tres factores que intervienen en la polución lumínica, particularmente en este último factor se pudo notar una correlación directa con el aumento o reducción de los niveles de polución medidos.
Los capítulos 1 y 2 contienen una revisión bibliográfica en tópicos relacionados con la polución lumínica y las normas que rigen el tema en algunos países. El capítulo 3 presenta el procedimiento seguido para la recopilación de información, con condiciones que variaron para cada zona. El capítulo 4 presenta una metodología que se recomienda sea usada en próximos trabajos que realice la Centrosur. Se incluye además una estimación de los costos para su implementación, así como un aproximado del ahorro que se tendría al reducir los niveles de contaminación lumínica, tomando como referencia experiencias de revistas especializadas en el tema. Finalmente se presentan las conclusiones y recomendaciones.
The main purpose of this thesis to introduce an efficient methodology in order to analyze the light pollution caused by street lightning in the city of Cuenca. To fulfil this purpose, important information was collected by using the sky quality meter (SQM-LU-DL). The results will be interpreted carefully because the weather conditions were different from the usual average.
With this information, a definite scale to represent light pollution in cities was recommended in order to make light pollution maps in a specific city. However, such scale has to be analyzed in future projects. Cloud cover, temperature, and humidity are the three factors involved in light pollution. The last one had an important influence in the increase or reduction of pollution levels.
Chapters 1 and 2 present a bibliographic review of topics related to light pollution as well as policies from different countries. Chapter 3 presents the methodology used for the collection of information and the varying conditions of the area. Chapter 4 introduces a methodology that is expected to be used by Centrosur in future tasks. This thesis also includes a cost estimate of its implementation as well as an estimated savings that might be achieved by reducing light pollution levels, based on experiences of specialized magazines. Finally, conclusions and recommendations are presented, too.
Ingeniero Eléctrico
Cuenca
2014-05-22T13:42:41Z
2014-05-22T13:42:41Z
2014
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/5531
spa
TE;363
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65242020-08-03T17:09:14Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Control de un reconectador por medio de un microcontrolador
Arce González, Freddy Gonzalo
Carrillo Torres, Hernán
Carga Electrica
Microcontroladores
Ingenieria Electrica
La construcción de un sistema de control basado en un microcontrolador para un reconectador se desarrolla en las siguientes etapas. a.- Conocimiento del funcionamiento del microcontrolador y el reconector. b.- Desarrollo de diagramas de bloque de flujo y del programa. c.- Pruebas y ajustes del sistema, por último en el análisis de resultados se comprueban estos datos contra los datos iniciales mostrándose así la validez de este sistema. Los resultados son dados como curvas y fotografías de la actuación del control
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:40Z
2014-06-24T21:17:40Z
1996
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6524
spa
TE-190
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/7122020-08-03T17:08:28Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Normas técnicas para diseño y expansión de las redes secundarias del sistema de distribución de la Empresa Eléctrica Regional Centro Sur C.A.
Domínguez Quilli, Edwin Fernando
Molina Cobos, Manolo Alejandro
León Córdova, Pedro
Quituisaca Astudillo, Patricio
Sempértegui, Eduardo
Empresa Electrica
Normas Tecnicas
Redes Secundarias
Distribucion Electrica
Energia Electrica
Ingenieria Electrica
El desarrollo del presente trabajo, trata sobre la obtención de una normativa para el diseño y parte de la construcción en redes secundarias de distribución de energía eléctrica, aplicado al área de concesión de la Empresa Eléctrica Regional Centro Sur C.A., en virtud de que los Ingenieros Eléctricos, dispongan de una guía que incluya las metodologías, procesos y recomendaciones para las fases de inicio, dimensionamiento y presentación del proyecto, con el objetivo de ordenar y orientar en la ejecución del diseño y para el cumplimento de niveles de calidad y características técnicas.
Ingeniero Eléctrico
Cuenca
2013-06-05T14:54:28Z
2013-06-05T14:54:28Z
2011
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/712
spa
TE;306
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/325532020-08-03T17:10:50Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis del impacto de la inserción de un sistema de generación distribuida en el alimentador 0427 ubicado en el Complejo Hidroeléctrico Machángara
Cuzco Tenempaguay, Mauro Xavier
Torres Contreras, Santiago Patricio
Sarmiento Vintimilla, Juan Carlos
Generacion Distribuida
Alimentador
Punto De Conexion
Digsilent
Perfil De Voltaje
Fallas
Perdidas Tecnicas
Cargabilidad
Armonicos
Este trabajo presenta un análisis técnico sobre el impacto de la inserción de la generación distribuida compuesta por pequeñas fuentes de generación renovables ubicadas en diferentes puntos del alimentador de distribución 0427. El análisis requerido por ARCONEL, de acuerdo con la norma IEEE 1547, se realizó utilizando el software DigSILENT de Power Factory. El análisis se lleva a cabo teniendo en cuenta los sistemas de generación fotovoltaica, turbinas eólicas e hidrocinéticas siendo parte de los estudios de pre-factibilidad realizados por ELECAUSTRO S.A. Se realizaron análisis tales como de estado estable, evaluación dinámica, estabilidad de voltaje, estabilidad de frecuencia y análisis armónico para evaluar el impacto en la red eléctrica. A partir de los resultados, fue posible evaluar diferentes parámetros de red como perfiles de voltaje, capacidad de carga de líneas y pérdidas técnicas. Además, se analizan sobretensiones y cortocircuitos. Finalmente, el análisis de armónicos de tensión forma parte de este trabajo.
Ingeniero Eléctrico
Cuenca
2019-04-26T12:36:02Z
2019-04-26T12:36:02Z
2019-04-26
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/32553
spa
TE;453
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66062020-08-03T17:09:57Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Análisis de la calidad de producto para el sistema de distribución de la Empresa Eléctrica Regional El Oro S. A.
Ordóñez Tituaña, Cristian Augusto
Sempértegui Alvarez, Rodrigo Efraín
Empresa Electrica
Servicio Electrico
Variaciones De Tension
Plan De Soluciones
En el presente trabajo de tesis se analiza los parámetros de Calidad de Producto en el Sistema de Distribución de la Empresa Eléctrica Regional El Oro, la importancia que tienen para los abonados servidos por esta empresa y el cumplimiento de los mismos basados en los limites emitidos en la regulación de Calidad de Servicio y Distribución emitida por el CONELEC, se estudia las causas y efectos de las perturbaciones de tensión existentes en el sistema eléctrico, las principales cargas productoras de flicker y armónicos, la clasificación de las variaciones de tensión, la distorsión de la onda de voltaje y los efectos en los diferentes equipos electrónicos sensibles a las perturbaciones de tensión las que son producidas en su mayoría por cargas no lineales, también se proporcionan soluciones generales tanto para consumidores finales, como para la empresa eléctrica las cuales se pueden adoptar para disminuir sus niveles y consecuencias. Las mediciones se las realizó con los medidores ION 7650 y CAVA 253, los mismos que cumplen con todas las normas internacionales y nacionales para calidad de energía, para agilitar el análisis de las mediciones se desarrolla un programa en Visual Basic el mismo que realiza los cálculos de los diferentes parámetros.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:49Z
2014-06-24T21:17:49Z
2006
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6606
spa
TE-264
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66402020-08-03T17:10:12Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Implantación de un sistema de gestión de interrupciones para determinar la calidad del servicio técnico de distribución en la Empresa Eléctrica Regional Centrosur
Arévalo Uguña, Freddy R.
Ordóñez Ríos, Juan G.
Sempértegui Alvarez, Rodrigo Efraín
Empresa Electrica
Gestion De Interrupciones
Servicio Tecnico
Sistema De Informacion
La calidad de servicio eléctrico ha tomado grandes avances en la actualidad, exigiendo a las empresas de distribución a mejorar el servicio brindado, por ello ha sido necesario realizar un estudio para la de implantación de un sistema de gestión de interrupciones aplicado en la Empresa Eléctrica Regional Centro Sur C.A. (Centro Sur), este nos ayudara en el registro de la interrupciones que se dan en la red eléctrica y al despacho inmediato de los grupos de trabajo, además nos permitirá el cálculo de los índices de calidad de servicio técnico .También se establecen los criterios que servirán al cálculo de las compensaciones, en caso de que no se cumplan con los límites dados en la regulación No. CONELEC - 004/01. Este sistema deberá interactuar con otros sistemas que ya se tienen implementados en la Centro Sur, como por ejemplo los sistemas SCADA (Sistema de Control y Adquisición de Datos), GIS (Sistema de Información Geográfico), bodegas y Sistema Comercial (SICO).
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:53Z
2014-06-24T21:17:53Z
2009
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6640
spa
TE-295
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64662020-08-03T17:08:50Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Diseño y construcción del principio básico de la comunicación digital usada en la telefonía celular y comunicación satélite basado en: modulación PCM, modulación FM y transmisión por ANTENA
Chacho Ochoa, Pablo Florencio
López E., Julio V.
Doutreloigne, Jan
Telefonia Celular
Comunicaciones
Transmision Por Antena
Ingenieria Electrica
Se hace un estudio teórico de los principios y técnicas básicas usadas en la comunicación satélite y telefonía celular. El estudio teórico se aplica diseñando y construyendo un sistema de digitalización de señales análogas usado en telefonía celular y comunicación satélite. El sistema construido consta de 4 módulos: codificador decodificador PCM, modulador-demodulador FM, transmisor receptor por antena y módulo de sincronización. Luego de construido el sistema fue sometido a algunas pruebas verificando su correcto funcionamiento y sus principios teóricos
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:31Z
2014-06-24T21:17:31Z
1993
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6466
spa
TE-136
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/242952020-08-03T17:08:30Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Estudio de la probalidad de pérdida de carga y pérdida de carga horaria para sistemas fotovoltaicos autónomos y/o conectados a la red en Ecuador
Altamirano Ortega, Daisy Catalina
Alvarez Cárdenas, Diego Germán
Sarmiento Vintimilla, Juan Carlos
Ingenieria Electrica
Sistema Fotovoltaico
Carga Horaria
Redes Electricas
Radiacion
Demanda Energetica
Ecuador
En la presente tesis se realiza el análisis y evaluación de distintos métodos de dimensionamiento de un sistema fotovoltaico basados principalmente en fiabilidad, mediante la generación de curvas isofiables, para luego hacer una comparación entre éstos y los métodos clásicos. Además se presentan métodos para generar datos de irradiación tanto horarios como diarios, luego, con los resultados obtenidos de estos métodos se comparan con datos reales y se evalúan los resultados de los métodos de dimensionamiento al utilizar cada uno de estos datos.
El primer capítulo trata sobre el estado de arte de la situación de la energía fotovoltaica, tanto en el mundo como en el Ecuador, además de algunas definiciones de fiabilidad, y Zuna breve descripción de los métodos utilizados. El segundo capítulo se refiere al marco teórico y la importancia que tiene el estudio de la fiabilidad en los sistemas fotovoltaicos, la descripción de los tipos de sistemas solares fotovoltaicos, su funcionamiento y sus elementos. En el tercer capítulo se expone algunos procedimientos a seguir para la generación de datos de irradiación, los cuales se emplearán en los métodos de dimensionamiento de los sistemas fotovoltaicos, luego se mostrará el procedimiento a seguir para realizar el dimensionamiento de los SFVAR y SFVCR. En el cuarto capítulo se exponen los resultados obtenidos al aplicar cada uno de los métodos de dimensionamiento, también se realiza un análisis y comparación entre los resultados, al utilizar datos reales y datos generados. En el quinto y último capítulo se presentan las conclusiones y recomendaciones.
In this thesis the analysis and evaluation of different methods of sizing of a photovoltaic solar system mainly based on reliability by generating isoreliability lines, and then make a comparison between them and the classical methods are performed. Furthermore, methods are presented to generate radiation data schedules and diaries. The results of these methods are compared with real data and the results of the sizing methods using each of these data are evaluated.
The first chapter, discusses the state of art of photovoltaics energy situation, both in the world and in Ecuador, in addition to some definitions of reliability, and a brief description of the used methods. The second chapter, refers to the theoretical framework and the importance of studying the reliability of photovoltaic solar systems, the description of the types of solar photovoltaic systems, its operation and its elements. In the third chapter, some procedures for radiation data generation are exposed, which are used in the methods of sizing photovoltaic systems, then, the procedure for sizing the stand alone and grid connected PV – systems will be displayed. In the fourth chapter, the results of applying each of the sizing methods are exposed, an analysis and comparison of the results are also performed, using real data and data generated. In the fifth and final chapter, the conclusions and recommendations are presented.
Ingeniero Eléctrico
Cuenca
2016-04-15T11:00:13Z
2016-04-15T11:00:13Z
2016
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/24295
spa
TE;388
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65042020-08-03T17:09:05Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Mantenimiento preventivo para centrales eléctricas asistido por computador
Torres Contreras, Marco Antonio
Brito Ayabaca, Fausto Rodrigo
Ortega Delgado, Iván
Centrales Electricas
Energia Electrica
En la parte teórica se hace una descripción de los tipos y métodos de mantenimiento que se aplican, se hace una exposición de un esquema general de mantenimiento a más de las estructuras de mantenimiento aplicadas en centrales de nuestro medio [INECEL Y EERCS]. Luego se hace una descripción de la forma de aplicar un mantenimiento informatizado a más de hacer una descripción del programa desarrollado. Como trabajo práctico se desarrolla un software [Base de datos] que asistirá en las labores de mantenimiento preventivo proveyendo datos como: Inventarios, actividades, recursos humanos y materiales necesarios para dichas actividades, etc.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:37Z
2014-06-24T21:17:37Z
1995
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6504
spa
TE-172
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66472022-08-15T08:01:10Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Estudio de pérdidas de energía en sistemas de distribución aéreos
Cordero, Bernardo
Vintimilla, Carlos
[Director no identificado]
Ingeniería Eléctrica
Electricidad
Aquí se estudia la formulación de un método analítico para la determinación de pérdidas de energía en un sistema de distribución aéreo, para la aplicación práctica del método se toma como muestra el alimentador No. 42 de la E.E.R.C.S., ya que es uno de los más representativos, debido a la diversidad de cargas a las que sirve. Luego de una revisión de conceptos afines, se presenta un programa digital para el cálculo de perdidas de distribución. Finalmente se presentan los resultados obtenidos con el programa, en el alimentador No. 42 ya mencionado.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:53Z
2014-06-24T21:17:53Z
1984
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6647
spa
TE-32
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/65882020-08-03T17:09:35Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Restauración de alimentadores considerando calidad de servicio técnico
Neira Campoverde, Jaime Patricio
Ochoa Pesántez, Luis Alberto
Salgado Rodríguez, Modesto
Alimentadores Electricos
Servicio Tecnico
Energia Electrica
Distribucion Electrica
Ante la expedición de la regulación [No.004/001], enviada por el CONELEC a todas las empresas eléctricas del país, estas tienen que garantizar un servicio continuo y confiable. El tema elaborado consiste en la elaboración de un programa computacional, que realiza la restauración de un alimentador ante la presencia de fallas, esta restauración se la lleva a cabo considerando los índices de calidad que la mencionada regulación estipula.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:47Z
2014-06-24T21:17:47Z
2002
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6588
spa
TE-247
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66072020-08-03T17:09:54Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Construcción de un pulsioxímetro con transmisión inalámbrica hacia un computador personal
Pérez Pulla, Paulino Amadeo
Uyaguari Diaz, Víctor Hugo
Cabrera Albornoz, Fabián
Pulsioximetrico
Oximetria
Convertidor De Voltaje
Microcontroladores
El presente trabajo tiene como objetivo el estudio, diseño y construcción de un pulsioxímetro con transmisión inalámbrica con un computador personal. En su desarrollo se analizan los requerimientos de los componentes necesarios, la factibilidad de conseguirlo en el mercado local, todo esto con el objeto de obtener un equipo a un bajo costo y que los resultados que entregue sean confiables para que el profesional de la salud pueda dar un diagnóstico certero a su paciente. El presente trabajo se concluye satisfactoriamente al observar que los parámetros entregados por el equipo desarrollado están dentro los rangos normales.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:49Z
2014-06-24T21:17:49Z
2006
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6607
spa
TE-265
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/348632022-08-05T14:49:58Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Desarrollo de una metodología para la ubicación de estaciones de carga de vehículos eléctricos, caso de estudio: ruta Cuenca–Guayaquil
Paute Torres, Jorge Andrés
Sempértegui Moscoso, María Emilia
Gonzalez Morales, Luis Gerardo
Espinoza Abad, Juan Leonardo
Ingeniería Eléctrica
Vehículos
Tecnología eléctrica
La presente tesis desarrolla una metodología para identificar la ubicación de
estaciones de carga rápida para vehículos eléctricos en rutas interprovinciales
y/o intercantonales, empleando un modelo matemático de consumo energético
de un vehículo eléctrico y con base en varios criterios de selección que deben
cumplirse en cada una de las potenciales ubicaciones para su selección final.
El capítulo 2 investiga el marco teórico acerca de los vehículos eléctricos, los
tipos de tecnologías de baterías, modos de carga y tipos de conectores, entre
otros temas.
Posteriormente, el capítulo 3 desarrolla el estudio de un modelo matemático
“cuasi-estacionario hacia atrás” para estimar el consumo energético de un
vehículo eléctrico, con base en el comportamiento dinámico que el vehículo
describe al moverse por la superficie de una carretera.
El capítulo 4 muestra el procedimiento empleado para la adquisición de datos
del vehículo mediante equipos de geolocalización y la computadora a bordo del
vehículo. Además, se realiza la implementación y calibración del modelo
matemático en Matlab, así como la validación del mismo mediante tres rutas de
prueba.
El capítulo 5 presenta el proceso metodológico desarrollado para obtener la
ubicación de la estación de carga rápida en la ruta Cuenca – Guayaquil, por la
vía Colectora Cuenca – Puerto Inca (E582), mediante el uso del modelo
matemático propuesto en el capítulo 4.
El capítulo 6 desarrolla la caracterización del comportamiento de la estación
de carga rápida PNE Solution de 50 kW y estudia el impacto de ésta en la calidad
de la energía eléctrica, tomando como referencia la Regulación No. ARCONEL
005/18.
Finalmente, el capítulo 7 presenta las conclusiones generales del trabajo,
recomendaciones y trabajos futuros.
In this work, the authors present a methodology to identify the location of fast
charging stations for electric vehicles at interprovincial and/or intercantonal
routes, using a mathematical model of a vehicle‘s energy consumption and based
on various criteria that each potential location must comply for its final selection.
In chapter 2, there is a review about electric vehicles, types of battery
technologies, charging modes and types of connectors, among other topics.
Subsequently, chapter 3 develops the study of a "quasi-stationary backward"
mathematical model to estimate the energy consumption of an electric vehicle
based on the dynamic behavior of a moving car on a road’s surface.
Chapter 4 shows the procedure used for data acquisition with a vehicle using
geolocation equipment and the vehicle's on-board computer. In addition, a
mathematical model implementation and its calibration are carried on Matlab, as
well as the validation through three test routes.
Chapter 5 presents the methodological process developed to obtain the
location of the fast charging station on the Cuenca - Guayaquil route via Colectora
Cuenca – Puerto Inca (E582), using the proposed mathematical model on
chapter 4.
Chapter 6 explains the behavior of the PNE Solution 50 kW fast charging
station and its impact on the quality of electrical energy, taking as reference
Regulation No. ARCONEL 005/18.
Ingeniero Eléctrico
Cuenca
2022-10-22T17:06:54Z
2022-10-23T17:06:54Z
2020-10-12
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/34863
spa
TE;471
Attribution-NonCommercial-NoDerivatives 4.0 Internacional
http://creativecommons.org/licenses/by-nc-nd/4.0/
openAccess
application/pdf
255 páginas
application/pdf
Universidad de Cuenca
oai:dspace.ucuenca.edu.ec:123456789/312532020-08-03T17:12:39Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Eficiencia energética en la Planta Yanbal Ecuador S.A.
Espín Murminacho, Julio Cesar
Neón Fernández, Ricardo Mauricio
Mogrovejo León, Wilson Fernando
Instalaciones Electricas
Puesta A Tierra
Sistema De Pararrayos
Calidad De Energia
Auditoria Energetica
Calidad De Servicio
Eficiencia Energetica
El trabajo titulado ‘’Eficiencia energética en la Planta Yanbal Ecuador’’ se realiza un diagnostico mediante el análisis de los diferentes sistemas eléctricos, permitiendo conocer la situación actual de la planta. Con esos conocimientos se propondrá medidas para aumentar la eficiencia energética, y reducir costos de energía.
Este trabajo se divide en cinco capítulos en los cuales se trataran diferentes temas, permitiendo el traspaso de la información hacia los lectores de una forma entendible y organizada. En el primer capítulo se realiza una introducción hacia las instalaciones eléctricas, los elementos que lo componen y los factores de calidad de energética.
En el segundo capítulo se hablan de las normas para la auditoria energética, la auditoria se realiza en base a las normas internacionales como IEEE, normas ISO, entre otras. El tercer capítulo trata temas de eficiencia energética, la metodología que sigue una auditoria energética, además de analizar los elementos que son eficientes y que sistemas se los puede mejorar.
El estudio y análisis de la planta Yanbal se realiza en el cuarto capítulo, se revisa el sistema de distribución, la puesta a tierra y el sistema de pararrayos. Además, se analiza los voltajes de línea a línea, armónicos y las mediciones termográficas. Se realiza un estudio para el mejoramiento de la eficiencia energética y a la vez se verifica los consumos eléctricos anteriores y actuales (años 2016 – 2018) con la implementación de luminarias ahorradoras de luz eléctrica. Finalmente, en el capítulo cinco se dan conclusiones y recomendaciones
The work title ‘’Eficiencia energética en la Planta Yanbal Ecuador’’, will do the energy diagnosis through analysis of the different electrical systems, making it possible to know the current situation of the plant. With this knowledge, measures will be proposed to increase energy efficiency and reduce energy costs.
This work is divided into five chapters; in each chapter will discuss different topics allowing the transfer of information to readers in a understandable and organized way. In the first chapter it will do an introduction of the electrical installations, the elements that compose it, the energy quality factors.
In the second chapter discussed the standards for energy audit, the audit is done based on international standards such as IEEE standards, ISO standards, and others. The third chapter deals with energy efficiency issues, the methodology followed by an energy audit, in addition, analyzing the elements that are efficient and which systems can be improved.
The study and analysis of the Yanbal plant is carried out in the fourth chapter, the distribution system, the grounding and the lightning rod systems are reviewed. In addition, line-to-line voltages, harmonics and thermographic measurements are analyzed. A study is made to improve energy efficiency while verifying the previous and current electrical consumption (years 2016 – 2018) with the implementation of electrical light saving luminaries. Finally, in chapter five conclusions and recommendations are given.
Ingeniero Eléctrico
Cuenca
2018-09-25T21:56:43Z
2018-09-25T21:56:43Z
2018
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/31253
spa
TE;425
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/64482020-08-03T17:07:33Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Sistema computarizado para el análisis de diagnósticos y ubicación óptima del centro de carga en redes secundarias
Molina Astudillo, César
López Vintimilla, Carlos Eugenio
Energia Electrica
Mediante esta tesis se elabora un programa computacional el mismo que permitirá mantener permanentemente actualizados los planos y datos de las redes secundarias, realizar análisis, diagnósticos, cálculos, evaluación de pérdidas y ubicación óptima del transformador de distribución. El programa se denominará REDES y ha sido desarrollado en CLIPPER 5.0. Se estudia el levantamiento planimétrico de 50 redes secundarias del área urbana de Cuenca, medición de la carga, creación de los archivos necesarios para el estudio de redes secundarias, metodología de análisis y evaluación de resultados
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:28Z
2014-06-24T21:17:28Z
1992
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6448
spa
TE-120
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai:dspace.ucuenca.edu.ec:123456789/66202020-08-03T17:10:04Zcom_123456789_30com_123456789_16com_123456789_33356col_123456789_40
Inyección de potencia reactiva en un sistema eléctrico de potencia mediante la ubicación digital de capacitores
Pineda, Franco
Luzuriaga Ochoa, Edmundo
León Córdova, Pedro
Potencia Electrica
Sistemas Electricos
Ingenieria Electrica
Se estudia el mejoramiento del factor de potencia y regulación del voltaje, inyectando al sistema potencia reactiva, mediante el uso de capacitores. Se realiza una revisión de los conceptos necesarios sobre capacitores. La modelación matemática de un S.E.P., para la ubicación de capacitores y se presenta un programa digital para luego aplicarlo al sistema eléctrico regional Centro Sur.
Ingeniero Eléctrico
Cuenca
2014-06-24T21:17:51Z
2014-06-24T21:17:51Z
1983
bachelorThesis
http://dspace.ucuenca.edu.ec/handle/123456789/6620
spa
TE-27
openAccess
http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
application/pdf
application/pdf
oai_dc///col_123456789_40/100