Logo Repositorio Institucional

Please use this identifier to cite or link to this item: http://dspace.ucuenca.edu.ec/handle/123456789/35347
Title: Time-driven activity-based costing in the assembly industry
Authors: Vedernikova, Olga
Siguenza Guzman, Lorena Catalina
Pesántez, Johanna
Arcentales Carrion, Rodrigo Nicanor
Keywords: Assembly industry
Processes
Time-Driven Activity-Based Costing
TDABC
metadata.dc.ucuenca.areaconocimientofrascatiamplio: 5. Ciencias Sociales
metadata.dc.ucuenca.areaconocimientofrascatidetallado: 5.2.1 Economía
metadata.dc.ucuenca.areaconocimientofrascatiespecifico: 5.2 Economía y Negocios
metadata.dc.ucuenca.areaconocimientounescoamplio: 03 - Ciencias Sociales, Periodismo e Información
metadata.dc.ucuenca.areaconocimientounescodetallado: 0311 - Economía
metadata.dc.ucuenca.areaconocimientounescoespecifico: 031 - Ciencias Sociales y Ciencias del Comportamiento
Issue Date: 2020
metadata.dc.ucuenca.volumen: Volume 14, Issue 4
metadata.dc.source: Australasian Accounting, Business and Finance Journal
metadata.dc.identifier.doi: 10.14453/aabfj.v14i4.2
metadata.dc.type: ARTÍCULO
Abstract: 
Costs and their determination play a critical role in all manufacturing companies. The traditional costing system has received criticism resulting from the arbitrary allocation of indirect manufacturing costs. As an important initiative to address its weaknesses, new costing methods such as the Time-Driven Activity-Based Costing (TDABC) have emerged. Unfortunately, up to our knowledge, no investigations have been applied in analyzing assembly companies thoroughly nor considering all the processes necessary to obtain the final products. This article explores the TDABC application in the assembly industry through comparison with traditional volume-based costing by focusing on manual and semi-automatized production. Since the research is descriptive, a multiple-case study design was implemented in the assembly of televisions, motorcycles, and printed circuit boards. The developed methodology allowed determining the existence of factory overhead and direct labor cost variances between two different cost accounting systems, which also affected the unit cost of the products. Findings also highlight the benefits of TDABC application in the assembly industry, along with the shortcomings and future potential of research in this area.
URI: https://www.scopus.com/record/display.uri?eid=2-s2.0-85091056777&doi=10.14453%2faabfj.v14i4.2&origin=inward&txGid=3117c8098010a51e82916d442211e9d1
metadata.dc.ucuenca.urifuente: https://ro.uow.edu.au/aabfj/
ISSN: 1834-2019
Appears in Collections:Artículos

Files in This Item:
File Description SizeFormat 
documento.pdfdocument1.2 MBAdobe PDFThumbnail
View/Open


This item is protected by original copyright



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Centro de Documentacion Regional "Juan Bautista Vázquez"

Biblioteca Campus Central Biblioteca Campus Salud Biblioteca Campus Yanuncay
Av. 12 de Abril y Calle Agustín Cueva, Telf: 4051000 Ext. 1311, 1312, 1313, 1314. Horario de atención: Lunes-Viernes: 07H00-21H00. Sábados: 08H00-12H00 Av. El Paraíso 3-52, detrás del Hospital Regional "Vicente Corral Moscoso", Telf: 4051000 Ext. 3144. Horario de atención: Lunes-Viernes: 07H00-19H00 Av. 12 de Octubre y Diego de Tapia, antiguo Colegio Orientalista, Telf: 4051000 Ext. 3535 2810706 Ext. 116. Horario de atención: Lunes-Viernes: 07H30-19H00