Logo Repositorio Institucional

Por favor, use este identificador para citar o enlazar este ítem: http://dspace.ucuenca.edu.ec/handle/123456789/32120
Título : Costeo ABC aplicado a los productos financieros de la Cooperativa de Ahorro y Crédito Jardín Azuayo en el período 2017 desde una perspectiva basada en el tiempo invertido por actividad (TDABC)
Autor: Sarmiento Pérez, Miryam Guadalupe
Sigüenza Jetón, Karla Dalila
Director(es): Chuisaca Alvarez, María Elena
Palabras clave : Tiempo Invertido
Productos Financieros
Costo Por Actividad
Ecuacion Del Tiempo
Cooperativa De Ahorro Y Credito
Variaciones
Contabilidad
Fecha de publicación : 18-mar-2019
Paginación: 226 páginas
Ciudad: 
Cuenca
Código Interno : TCON;1177
Tipo: bachelorThesis
Abstract: 
El presente proyecto integrador realiza una propuesta de costeo basado en la metodología conocida como TDABC( Time Drive Activity Based Costing) que tiene como objetivo llegar a conocer los costos de los productos financieros de la Cooperativa de Ahorro y Crédito Jardín Azuayo desde una perspectiva basada en el tiempo para luego realizar una comparación con la metodología del costeo ABC (Activity Based Costing) desarrollado por la cooperativa, y de esta forma analizar las falencias y desventajas que influyen para la toma de decisiones. La metodología del Time Drive Activity Based Costing utiliza todas las cuentas de gastos relacionadas con los productos financieros de la cooperativa y también las horas trabajadas por cada empleado durante el año 2017, para obtener un costo por minuto, adicionalmente mediante observación directa se consiguen los tiempos invertidos de cada actividad para después analizarlos a través de la ecuación del tiempo considerando sus variaciones ocasionadas por diferentes factores en cada transacción con el fin de conocer cuál es el tiempo real empleado en cada actividad, luego para conocer el costo de cada actividad, se multiplica el costo por minuto obtenido por el tiempo calculado mediante la ecuación del tiempo. Después de ejecutar la metodología del costeo TDABC los resultados presentados son más elevados en comparación a los resultados del costeo ABC debido a diversos factores.
Resumen : 
The present integrative project makes a cost proposal based on the methodology known as TDABC (Time Drive Activity Based Costing), the same one that search to know the costs of the financial products of the Cooperativa de Ahorro y Crédito Jardín Azuayo, since a perspective based on the time for to compare the ABC costs methodology (Activity Based Costing) done by the cooperative, and then analyze the flaws and disadvantages, allowing contributing to better decision making. The Time Drive Activity Based Costing methodology uses all expense accounts related to the cooperative's financial products and also the hours worked by each employee during the year 2017, and after that, will obtain a cost per minute, additionally through direct observation the invested times of each activity are obtained and then analyzed through the equation of time considering its variations caused by different factors in each transaction in order to know what is the real time employed in each activity, then to know the cost of each activity multiplies the cost per minute obtained by the time calculated by the equation of time.
Grado Académico: 
Contadora Pública Auditora
URI : http://dspace.ucuenca.edu.ec/handle/123456789/32120
Aparece en las colecciones: Tesis de Pregrado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Trabajo de Titulación..pdftexto completo7.01 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está protegido por copyright original



Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.

 

Centro de Documentacion Regional "Juan Bautista Vázquez"

Biblioteca Campus Central Biblioteca Campus Salud Biblioteca Campus Yanuncay
Av. 12 de Abril y Calle Agustín Cueva, Telf: 4051000 Ext. 1311, 1312, 1313, 1314. Horario de atención: Lunes-Viernes: 07H00-21H00. Sábados: 08H00-12H00 Av. El Paraíso 3-52, detrás del Hospital Regional "Vicente Corral Moscoso", Telf: 4051000 Ext. 3144. Horario de atención: Lunes-Viernes: 07H00-19H00 Av. 12 de Octubre y Diego de Tapia, antiguo Colegio Orientalista, Telf: 4051000 Ext. 3535 2810706 Ext. 116. Horario de atención: Lunes-Viernes: 07H30-19H00